Calendar

Loading Events

« All Events

  • This event has passed.

C.T. Wilson/ Window Replacement at Cary High School

November 12

Project Name:  Window Replacement at Cary High School
Location: 638 Walnut Street, Cary, NC 27511, United States of America
Project Size: 100,000 sq. ft.
Project Information:
Removal of existing ACM Window, Door, and Transom Systems, Augmentation of existing bluestone masonry sills, saw cutting exterior masonry to accommodate egress windows, installation of new storefront, windows, and transom panels with areas of MEPS penetrations. Interior and exterior temporary protection and partitions needed between trade activities. Phasing between buildings to accommodate occupied spaces.


Client Files

 

Addendum 01 – Cary HS Window Replacement.pdf

Addendum 02 – Cary HS Window Replacement

Addendum 03 – Cary HS Window Replacement.pdf

UPDATE:

A site visit has been arranged for Monday, November 8th from 1-3pm.

The lead engineer for the project will be at the front office area (off Walnut Street) at 1pm and then move towards the back of the campus near the picnic tables until 3pm. If you or someone on your team plans to be there, please be sure to reach him on-site so you checked are in with the school.