Cape Fear Public Utility Authority/ Twin 24-inch Raw Water Transmission Mains Replacement

October 6, 2022

Cape Fear Public Utility Authority is accepting bids for the Twin 24-inch Raw Water Transmission Mains Replacement. Scope of work includes replacing the existing twin 24‐inch raw water transmission mains (RWTMs) between Toomers Creek and North Terminal Road with a new 30-inch main (approximately 8,200 LF). Engineer’s Opinion of Probable Construction Cost: $11,500,000. – $11,600,000., and this project is receiving SRF funding from the NCDEQ.

Adv for Bids-Twin 24

_Addendum 2 – sealed – FINAL

Addendum 5-Twin 24 inch RWTM

plan holders list – 9-29-2022- Twin 24 inch RWTM

 