Chesterfield County, Virginia Utilities Department / Proctors Creek WWTP Flow Equalization, Screening and Grit Removal Improvements

July 25

If this link does not work, please go to https://securecc.smartbidnet.com/LCZM and enter the access key: 3bf8735bd434182
Yes, I’ll Bid All Codes No, I Won’t Bid this Job Click Here to View the Project

 

Reply with your intent to quote or questions to Thalle Construction Co, Inc.


Proctors Creek WWTP Flow Equalization, Screening and Grit Removal Improvements
see link above for amendment documents


  Request for Quote
For Construction Subcontractors Services and Materials

Project:  Proctors Creek WWTP Flow Equalization, Screening and Grit Removal Improvements
Client:  Chesterfield County, Virginia Utilities Department 
Engineer:  Hazen [Project No. 32325-023]
Project location In vicinity of  1200 Coxendale Road {Coordinates 37.3804 / -77.3915} – , VA 23836-  
Offer Deadline; respond with offer ASAP or in advance of    July 25, 2025 03:00 PM


Offers may be emailed to  quotes@thalle.com   include project title in subject line. Proposals are encouraged to be on company letterhead, Contact information (phone & email), Related Unit Price line items, description of scope inclusions or exclusions. Additional factors may include: offer’s business-utilization participation, Performance-Bond % rate, Capabilities & qualifications, acknowledgement of project documents requirements and compliance.


Project Scope Includes (but is not limited to) :

  • Construction of a new Coarse Screen and Grit Removal Facility (CSGF), a Twelve (12) MG Equalization (EQ) storage facility and associated pump station.
  • Construction of two (2) new electrical buildings to service the new CSGF and EQ Facility.
  • Modifications to the Fine Screen influent structure and Fine Screen effluent structure.
  • Improvements to the existing influent pump station.
  • Improvements to existing yard piping, electrical duct banks and structures, grading, paving and drainage improvements.
  • Demolition of two (2) existing aerated grit facilities, junction boxes, bar screen structure, and yard piping as well as multiple utility relocations.

Contract Time: substantially complete within 1220 calendar days and fully complete 1280 calendar days from contract commencement


MATERIALS, SUBCONTRACTORS AND SERVICES SOUGHT
– General:
 Temporary construction facilities & services, Materials Testing, Surveying & as-builts, temporary pumping,
– Earthwork: earthwork, aggregates, geotextiles, clearing, grubbing and site prep, dewatering, erosion and sediment control, steel sheet piling, drilled piers.
– Demolition: asphalt, pavement, building and select utilities. Phased Demo.
– Metals: Guards and railing, structural steel rebar, rebar placement, ladders, metal stairs, metal fabrication.
– Wood and Plastics: Rough carpentry, glass fiber and resin fabrication
– Thermal and Moisture Protection: 
dampproofing, crystalline water proofing, water repellants, building insulation, standing seam metal roofing and wall panels, firestopping.
– Concrete: Flatwork and curbs, CIP, precast concrete utility buildings, grout
– Masonry: mortar, unit masonry
–  Openings: steel doors and frames, fiberglass windows and frames, roll-up doors, aluminum windows and frames, glass and glazing.
– Finishes: Painting and Polyurethane MIC coatings
– Specialties: Identifying devices, fire extinguishers
– Specialty Construction: Aluminum Flat Covers
– Specialty Equipment: cranes and hoists
– Plumbing: plumbing and piping insulation, facility fuel piping, facility water dist. piping, domestic water, sanitary waste and vent piping, storm drainage, plumbing fixtures, electric water heater.
– HVAC: insulation, Automatic temperature controls, refrigerant piping, ducts, fans, Flexible water tube condensing water heaters, gas fired unit heaters, split system AC, electric-resistant air coils. 
– Electrical: 
low voltage, fire alarm system, facility lighting/protection
– Exterior improvements: paving and surfacing, surface restoration, steel fencing, final grading and landscaping, seeding
– Utilities: 
Prestressed concrete cylinder pipe, utility structures, storm drains and roof drains, underground electrical
– Process Interconnections: copper pipe, DIP, stainless steel pipe, steel pipe, Valves and gates, valve and gate actuators, Fabricated stainless steel slide gates, gate valves, eccentric plug valves, ball valves, check valves, fire, wall and yard hydrants, automatic backwash strainer, heat tracing systems, insulation, process control systems, field testing, operator interface terminals, level switches, magnetic flow meters, pressure and differential pressure gauges, radar level meters, submersible level sensors, ammonium analyzers, single point gas monitoring system, isolators, intrinsically-safe barriers and surge suppressors
– Process Gas and Liquid Handling, Purification, and Storage Equipment: pumps, horizontal recessed impeller pumps, submersible solids-handling pumps and rehabilitation
-Water and Wastewater Equipment: automatic refrigerated samplers, Multi Rake Bar Screens and Screenings Handling Equipment, Stacked Tray Grit Removal Equipment, Grit Cyclones and Classifiers, high speed submersible mixers, tipping buckets, screw conveyors
– Building: CMU, turnkey sub.


DOCUMENTS: Please review contract documents to prepare your offer. SEE BANNER AT TOP OF THIS EMAIL to download at no cost

CONTRACT COMPLIANCE All contracts and purchase orders will comply with and flow-down contract documents requirements, contract clauses, may include not limited to: qualification requirements; State & Federal laws and regulations Insurance Coverage, Employment Practices, wage obligation, taxes, Civil Rights Acts, Equal Employment,   Business Utilization MBE/WBE/DBE firms are encouraged to participate, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. Firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements, or to inquiry Thalle’s Insurance requirements, payment terms, pre approval for agreements or quickpay, may contact Thalle Construction Co Inc. for business assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons-based on capabilities.

CONTACTS:  Estimating Dept.  Thalle Construction Company Inc  – corp. office.900 NC HWY 86 Hillsborough NC 27278
phone 919.245.1490 fax 919.241.1659: Estimating-Dept quotes@thalle.com   Vincent Zannini 919.241.1635 Craig Miller 919.241.162

Craig A. Miller
Senior Estimator
Thalle Construction Company Inc
cmiller@thalle.comquotes@thalle.com
Direct 919.241.1627 Cell 919.725.2774
Vincent Zannini
Estimating/Engineering Dept
Thalle Construction Company Inc.
vzannini@thalle.comquotes@thalle.com
Direct 919.241.1635 Cell 919.201.0864