
- This event has passed.
Dellinger/Estill Wastewater Treatment Plant
May 25 @ 2:00 pm
DAVIS BACON WAGE RATES APPLY
Estill Wastewater Treatment Plant and
Land Application System Upgrades & Improvements
Phase 3
Location: Estill, South Carolina
Engineer: Alliance Consulting Engineers, Inc.
Bid Date: Thursday, May 25, 2023 @ 2:00 pm
Dellinger, Inc. is soliciting bids from bonafide Minority, Women, Disadvantaged Business Enterprise, and Small Business subcontractors and suppliers for the above referenced project and the listed disciplines below. Plans and specifications are available at iSqFt, Dodge, and the link on the email below. For additional information on plans and specifications or any other items, please contact Marie Lathan, in our Monroe office by emailing marie@dellinger-inc.com or calling (704) 506-7273.
Please respond by emailing, calling, faxing, or mailing your intentions to quote as soon as possible. The scope of supply should be received in our office no later than 24 hours prior to bid. Final pricing should be received a minimum of two (2) hours prior to bid time. Scopes and final pricing can be faxed to (704) 289-8217 or emailed to marie@dellinger-inc.com.
A valid insurance certificate will be required showing Dellinger, Inc. as an additional insured on a primary basis for general liability coverage for ongoing operations and for completed operations. Dellinger, Inc. has a quick pay policy once the work has been reviewed and approved by the Owner. The subcontractor shall comply with applicable safety laws, rules, and regulations (Federal, State, Municipal, etc.).
Division 2
Hauling, Grading, Clear & Grub, Stone, Silt Fence, Remove & Replace Fencing, Seeding, Temporary Bypass Pumping, Sludge Removal
Division 9
Painting
Division 13
Geomembrane Liner
Division 15
Piping
Division 16
Electrical – (Note from Engineer: Please disregard any Electrical Work related to the Influent Pump Station, Equilization Basin,
Chlorine Contact Chamber, Effluent Pumps and Effluent Basin – These were completed in previous phases or
Have been removed from the Project Scope.)
Division 17
Instrumentation
Link to Plan Room:
|
||
|
||
Thanks,
Marie T. Lathan
Project Manager
Dellinger, Inc.
(704) 506-7273 – cell
(704) 283-7551 ext. 263
(704) 289-8217 fax
This email is confidential and intended solely and exclusively for the individual identified above. If the recipient of this email is not the identified above, please immediately notify the sender by telephone and delete this email; please do not read, copy, distribute, or disseminate this email.