Loading Events

« All Events

  • This event has passed.

Dellinger/Estill Wastewater Treatment Plant

May 25, 2023 @ 2:00 pm

DAVIS BACON WAGE RATES APPLY

 

 

Estill Wastewater Treatment Plant and

Land Application System Upgrades & Improvements

Phase 3

Location:  Estill, South Carolina

Engineer:  Alliance Consulting Engineers, Inc.

Bid Date:   Thursday, May 25, 2023 @ 2:00 pm

 

Dellinger, Inc. is soliciting bids from bonafide Minority, Women, Disadvantaged Business Enterprise, and Small Business subcontractors and suppliers for the above referenced project and the listed disciplines below.  Plans and specifications are available at iSqFt, Dodge, and the link on the email below.  For additional information on plans and specifications or any other items, please contact Marie Lathan, in our Monroe office by emailing  marie@dellinger-inc.com or calling (704) 506-7273.

Please respond by emailing, calling, faxing, or mailing your intentions to quote as soon as possible.  The scope of supply should be received in our office no later than 24 hours prior to bid.  Final pricing should be received a minimum of two (2) hours prior to bid time.  Scopes and final pricing can be faxed to (704) 289-8217 or emailed to marie@dellinger-inc.com.

A valid insurance certificate will be required showing Dellinger, Inc. as an additional insured on a primary basis for general liability coverage for ongoing operations and for completed operations.   Dellinger, Inc. has a quick pay policy once the work has been reviewed and approved by the Owner.  The subcontractor shall comply with applicable safety laws, rules, and regulations (Federal, State, Municipal, etc.).

 

 

Division 2

Hauling, Grading, Clear & Grub, Stone, Silt Fence, Remove & Replace Fencing, Seeding, Temporary Bypass Pumping, Sludge Removal

Division 9

Painting

Division 13

Geomembrane Liner

Division 15

Piping

Division 16

Electrical – (Note from Engineer:  Please disregard any Electrical Work related to the Influent Pump Station, Equilization Basin,

Chlorine Contact Chamber, Effluent Pumps and Effluent Basin – These were completed in previous phases or

Have been removed from the Project Scope.)

Division 17

Instrumentation

 

Link to Plan Room:

 

Estill SC – WWTP Upgrades
This link will work for anyone.

Thanks,

 

Marie T. Lathan

Project Manager

Dellinger, Inc.

(704) 506-7273 – cell

(704) 283-7551  ext. 263

(704) 289-8217 fax

marie@dellinger-inc.com

 

 

http://www.dellinger-inc.com

 

This email is confidential and intended solely and exclusively for the individual identified above. If the recipient of this email is not the identified above, please immediately notify the sender by telephone and delete this email; please do not read, copy, distribute, or disseminate this email.

 

 

 

 

 

Details

Date:
May 25, 2023
Time:
2:00 pm
Event Category: