Loading Events

« All Events

  • This event has passed.

HDR Engineering/ Belmont, NC – North Belmont Booster Pump Station

April 5, 2022

Belmont, NC – North Belmont Booster Pump Station

The Project includes the following Work:
The work included as part of this project includes constructing a concrete foundation for a new package booster pump station with associated electrical, HVAC, site clearing, grading and I&C specialties. Work also includes providing and setting package booster pump station, tapping, existing, 16 IN diameter water line and installing necessary fittings, pipe, valves, check valves, emergency natural gas generator and gas feed, appurtenances and specialties and pressure testing and disinfecting prior to commissioning.

For information regarding this Invitation to Bid, contact as follow:

Scott Snyder
HDR Engineering Inc.
15 South Main Street, Suite 601, Greenville, SC 29601
Phone: 864-631-0439
Email:scott.snyder@hdrinc.com

Bids are requested for the following Contract: City of Belmont, North Belmont Booster Pump Station.

The project has an expected duration of 210 days.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

THIS IS THE OFFICIAL SITE TO ORDER THE BID DOCUMENTS FOR THIS PROJECT – AND THE ONLY WAY TO BE ADDED TO THE PLAN HOLDERS LIST!

A printed bid set is $135.00 plus applicable sales tax.

A printed bid set & USB Drive with PDF files for $160.00 plus applicable sales tax.

A set is also available for download in PDF for $102.00 plus applicable sales tax. Downloads do not include addenda, they are all available on the “Addenda” tab of this page. Once payment is secured, you will receive an email that your files are ready to be downloaded from your account.

To place an order click on “PLACE ORDER” at the upper right of this page.

Payment can be made by either:
1.Credit Card
2.Check made payable to Duncan-Parnell – mail check to: PO Box 35649, Charlotte, NC 28235 ATTENTION: MICHAELA. To expedite your order you can email copy of your check to michaela.bruinius@duncan-parnell.com. Printing will not begin until a copy of the check OR the check is received
3.Duncan-Parnell Account

Any print order placed on this site includes all plans and specifications, including any addenda released at the time of order. Downloads do not include addenda, they are all available on the “Addenda” tab of this page. Planholders will be notified by email when future addenda are issued. It is the responsibility of each plan holder to download the addenda. Shipping, if required, will be charged to each order.

Online orders are filled within 1-2 business days after payment is secured.

All project notifications, including addenda, are sent via email from the mail domaine of “@dpibidroom.com“. This could be flagged as spam by your company network firewall. To prevent delay of project notifications, including addenda, have your company’s Information Technology Manager and “white list”the domain of dpibidroom.com to prevent emails from being captured.

ADDENDA DISTRIBUTION

Existing planholders will be notified by email upon the release of any addenda. Failure to order bid sets through Duncan-Parnell may prevent you from being notified of issued addenda. Printed copies of addendum will be available at no additional charge. Shipping, if required will be charged. Contact your local Duncan-Parnell office to request a printed set of addenda files. Click here to find the location nearest you.

For Project Details Click Here

Details

Date:
April 5, 2022
Event Category:

Leave a Comment