Calendar

Loading Events

« All Events

  • This event has passed.

Jimmy R Lynch and Sons/ Winston-Salem (Forsyth County) – Upper Peters Creek Outfall Replacement, FB22241

May 2

Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.

We would appreciate a quotation from your firm for any and all work and/or materials on the following project:

Project Name:  Winston-Salem (Forsyth County) – Upper Peters Creek Outfall Replacement, FB22241

Bid Date: Tuesday, May 3, 2022 @ 2:00 PM

Please provide your proposal by: 5-2-22 @ 5:00 PM.

We are soliciting subcontract bids for the following trades. Work may include, but not limited to: Pipe Work, Water, Sewer, Erosion Control, Traffic Control, Utilities, Concrete Work, Video Surveillance, Surveying, Asphalt Paving, Stone, Seeding, Mulching, Earthwork, Clearing & Grubbing, Site Grading, Landscaping, Demolition, Geosynthetics, Geo-Textile, Cleaning, Fencing/Gates, Quality Control, Topsoiling, Rip-Rap, Excavation, Pavement Marking, Concrete Curb & Gutter, Dewatering, Exterior Improvements, CIPP Liner, Photographic Services along with any incidentals and materials necessary for construction to complete the project.

The Scope of Work to be performed under these Contract Documents is generally described as follows: Replacing/upsizing approximately 9,100 LF of 12- to 24-inch pipe with 16- to 30-inch pipe and installing approximately 854 LF of 24- and 30-inch cured-in-place (CIPP) liner. The project is in and near downtown Winston-Salem.

The work performed under this Contract shall include, but may not be limited to: the furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.

Please contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions on the job link below.  

Here is the link to the electronic plans and specs:  WSFCU WIN2001  https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fhiepc.sharepoint.com%2f%3af%3a%2fs%2fHIGHFILLProjectBidInfo%2fEulJuwpa9fFImxabDsRHlFcBhHqPbuiUYVwCeZjSW2faWg%3fe%3dJaGRiU&c=E,1,HetJYBa72vP0-FMmVgrv3wjJJqIizZXa4jgyluJKejP8BC84_a81H6dkF4tcSNQbnvffXB9UnKIyhivi4huF37cR-NltSO95hHJmdp41HVV2bQ,,&typo=0

You may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn, NC.  Also, Bidding Documents also may be examined at the following locations and All work will be in accordance with the Plans and Specifications that are on file in the offices of:

  1. Highfill Infrastructure Engineering, PC, 380 Knollwood Street, Suite 734, Winston-Salem, NC, 27103 – (Issuing Office);
  2. WSFC Utilities, BAS Building Suite 257, 100 E. First Street, Winston-Salem, NC 27101.

JRL is willing to review any responsible quote and will negotiate terms, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 5-10-22 and I will inform you of the status of your bid.   If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance.

Bonding: 

It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.

Financial Assistance:

Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.

Quick Payments:

It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner

JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.

Please Submit Quote the Day Prior to Bid Opening

Phone:  336-368-4047    Fax:  336-368-4613

Details

Date:
May 2
Event Category: