Calendar

Loading Events

« All Events

  • This event has passed.

JR Lynch & Sons/City of High Point (Guilford County) Riverdale Sewer Lift Station-West

February 18

Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.

We would appreciate a quotation from your firm for any and all work and/or materials on the following project:

Project Name:  City of High Point (Guilford County) Riverdale Sewer Lift Station-West

                          Force Main   Bid # 06-021821  

                   

       

Bid Date:   Thursday, February 18, 2021 @ 2:00 PM 

 

Please provide your proposal by: 2-17-20 @ 5:00 PM

We are soliciting subcontract bids for the following trades. Work may include, but not limited to: Pipe Work, Sewer, Electrical, Hauling, Erosion Control, Traffic Control Signs, Utilities, Asphalt Paving, Seeding, Mulching, Instrumentation & all Mechanical & Electrical Appurtenances, Clearing & Grubbing, Precast Concrete Structure Work, Landscaping, Quality Control, Rip-Rap Stone, Excavation, Pavements and Appurtenances and any incidentals and materials necessary for construction to complete the project.

This project includes the installation of approximately 2,700 linear feet of 36-inch DIP sanitary sewer force main, from the Riverdale Sewer Lift Station located off Riverdale Rd to the Riverdale Gravity Sewer (under construction in separate contract) located along Riverdale Rd, installation of three (3) combination air release valves in manholes built on the 36” DIP sanitary sewer force main, installation of a magnetic flow meter inside a precast concrete vault on the 36” DIP sanitary sewer force main, asphalt paving at the Riverdale Sewer Lift Station site, site work, erosion control measures and associated appurtenances.

The work performed under this Contract shall include, but may not be limited to: the furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full. All work will be in accordance with the Plans and Specifications

Please contact Daniel Lynch at dlynch@jrlynchandsons.com for a link to the project documents.

 

You may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn, NC Phone:  336-368-4047 Fax:  336-368-4613 or

Also, Libby Rush
City of High Point NC
211 S. Hamilton St., High Point NC
Phone: 336-883-3220
Email: libby.rush@highpointnc.gov

Contract Documents and Plans can be reviewed and purchases made from: Duncan Parnell Company, Inc. 4275 Regency Drive, Suite 100

Greensboro, NC 27410

Office Phone Number: (336) 855-1211

Toll Free Number: (888) 688-7961

Fax Number: (336) 855-8868 http:// www.dpib id room.com

 

Contract documents, including Drawings and Technical Specifications, are on file and may be reviewed at the following locations:

 

McGraw Hill/Dodge Plan Room 4300 Beltway Place

Arlington, TX 76018

 

Hispanic Contractors Association / ConstructConnect

The Rockwood Exchange                                                       ·

3825 Edwards Road, Suite 800

Cincinnati, OH 45209 www.constructconnect.com

 

The Blue Book Building and Construction Network 800 E Main Street

Jefferson Valley, NY 10535

   888-720-1710

www.thebluebook.com

 

 

JRL is willing to review any responsible quote and will negotiate terms, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact me if you have not heard from JRL by 2-25-21 and I will inform you of the status of your bid.

 

JRL will not require any M/WBE subcontractor to provide bonding.  We will allow you to work under our bond free of charge.  We will provide joint check agreements, as needed.  We will also provide quick payments. (Typically, on a weekly basis)

 

Bonding: 

It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.

 

Financial Assistance:  

Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.

Quick Payments:

It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner

JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.

Please reply YES or NO along with your company name if your company is planning on bidding this project

Thanks,

 
 
 

Cathy Snow

Corp. Secretary
336.368.4047

Jimmy R. Lynch & Sons, Inc.

 

Details

Date:
February 18
Event Category: