Calendar

Loading Events

« All Events

  • This event has passed.

Shook Construction/Sanford Buffalo Water

March 9 @ 10:00 am

Shook Construction is as a Prime Contractor on the Big Buffalo Water Reclamation Facility Flood Rehab project in Sanford, NC.  The work under this project includes flood rehabilitation and equipment replacement for the following facilities: Influent distribution box, fine screen facility No.1 & 2, grit collection facility, influent pump station, old influent pump station and grit handling facility.      

 

This project bids on March 9, 2020 at 10:00AMHowever, in order for us to prepare the bid documents for submittal by the published bid time, we ask that quotes be submitted no later than 3:00PM March 8th to estimating@shookconstruction.com or fax: (866) 652-7331. 

Scope Items Include: General Conditions, Roofing, Overhead Coiling Doors, Heat Tracing, Pipe Insulation, Pump and Motor Rehabilitation, HVAC, Electrical and Instrumentation & Controls.

Shook Construction is able to provide assistance with bonding and insurance requirements, including alternatives to bonding and/or insurance requirements for subcontractors if needed.  If there are any questions regarding this invitation to bid, please feel free to contact me.

 

Thank you for your assistance,

 

 

 

Leah Reitano
Project Administrator

3453 Apex Peakway | Apex, NC 27502
P: 919.290.8141 | F: 919.290.8081
E: lreitano@shookconstruction.com | www.shookconstruction.com

ITB – MBE WBE – Big Buffalo WRF Flood Rehab

Details

Date:
March 9
Time:
10:00 am
Event Category: