- This event has passed.
ST Wooten/ Albert J. Ellis Airport Runway 5-23 Rehabilitation
September 9, 2022
Title: ALBERT J. ELLIS AIRPORT RUNWAY 5-23 REHABILITATION |
Bid Due Date: September 9, 2022 01:00 PM (ET) |
Project Description: |
S. T. Wooten is requesting material and subcontractor quotes for the Runway 5-23 Rehabilitation at Albert J Ellis Airport located at 264 Albert Ellis Airport Road, Richlands, North Carolina 28574. The project includes the rehabilitation of a 7100-foot bituminous aircraft runway, rehabilitation of a 200-foot by 200-foot blast pad, rehabilitation of six taxiway connectors, pavement markings, grooving, and minor electrical improvements. Potential subcontracting opportunities include construction survey/layout, milling asphalt pavement, grooving asphalt pavement, erosion control, work zone barricades/signage, pavement markings and airfield electrical/lighting. |
Trade Codes: 000050 000055 001206 001660 000060 000607 000801 001105 008100 |
If this link does not work, please go to https://securecc.smartbidnet.com/LBTD and enter the access key: becbd56ac1a6172 |
Yes, I’ll Bid All Codes | No, I Won’t Bid this Job | Click Here to View the Project |
Addendum Description: |
The following changes shall be made to the Bid Documents: PLANS: SHEET C001 – INDEX OF SHEETS AND SUMMARY OF QUANTITIES • Updated Sheet Index to include new sheets C112 and C212 • Added Summary of Quantities tables with new pay items for Bid Alternatives 1 & 2 SHEET C020 – OVERALL PHASING PLAN AND GENERAL NOTES • Updated phasing plan, schematic construction sequencing, and phasing narratives to include Phases 6 and 7 for Bid Alts. 1 & 2, respectively • Updated anticipated Phase 2 (Runway) work to take place from April 15, 2023 to June 4, 2023 • Added general phasing note describing millings placement work timeframe SHEET C040 – PROJECT KEY MAP • Added sheet layouts “BA1” and “BA2” to keymap for Bid Alternatives 1 & 2 project areas SHEET C112 – DEMOLITION PLAN (BID ALT. 1 AND 2) • New sheet SHEET C212 – GEOMETRY PLAN (BID ALT. 1 AND 2) • New sheet SHEET 720 – PAVEMENT MARKING DETAILS (SHEET 1 OF 2) • Added “DASHED TAXIWAY EDGE MARKING” detail, applicable to Bid Alt. 1 • Added “APRON TIE-DOWN MARKING” detail, applicable to Bid Alt. 2 SPECIFICATIONS: BID SCHEDULE • Added separate bid schedules for Bid Alternatives 1 & 2 GENERAL CONTRACT PROVISIONS • Revised Definition 10-36 to update anticipated NTP date to “early April” P-605 – JOINT SEALANTS FOR PAVEMENTS • Added specification, applicable to Bid Alt. 1 ADDITIONAL ANSWERS TO BIDDER’S QUESTIONS |