ADVERTISEMENT FOR BIDS

PROJECT:             Greenville Utilities Commission Water Treatment Plant

Phase 1 Improvements

 

LOCATION:         1721 Water Way Road, Greenville, NC  27834

 

OWNER:              Greenville Utilities Commission

801 Mumford Road, Greenville, NC  27834

Contact:  David Springer, P. E.

 

CMAR:                  T. A. Loving Company

400 Patetown Road

Goldsboro, NC  27530

 

Separate sealed bids will be received from Pre-Qualified Bidders until March 18, 2020 at the Greenville Utilities Commission WTP Backflow Training Building, 1721 Water Way Road, Greenville, NC  27834, per the following schedule:  Group I (1:00 PM):  BP-001 Erosion Control and Sitework; BP-002 Masonry; BP-003 Structural Steel; BP-004 Roofing and Translucent Skylight Assemblies; BP-005 Waterproofing and Joint Sealants; BP-006 Doors, Frames, and Hardware; Group II (2:00 PM) BP-007 Painting; BP-008 Pre-Engineered Metal Buildings; BP-009 HVAC; BP-010 Plumbing; BP-011 Electrical; BP-012 Fire Sprinkler System; Group III (3:00 PM) BP-013 WTP Construction.

 

TA. Loving Company will receive sealed bids for portions of the above Project as specified herein and in the Instructions to Bidders until the dates and times indicated. Bids will then be publicly opened and read aloud. Failure to submit a Bid prior to the due date and time may be cause for rejection.

 

Procedures for submitting a Bid, claiming an error, withdrawal of Bids, and other pertinent information are contained in the Instructions to Bidders.  All rights are reserved to reject any or all Bids, waive any informalities, or to award such contract as in its judgement is deemed to be in the best interest of the Owner.

 

Only Bids from Pre-Qualified Bidders will be accepted.  A complete listing of Pre-Qualified Bidders may be found in the Bidder’s Manual for this project.

 

Electronic copies (.pdf) of the Bid Documents can be obtained from our online plan room at www.taloving.com/subcontractors-vendors under the Utility Division section.  Technical questions or questions related to submitting a bid should directed as indicated in the Instructions to Bidders.

 

The Project consists of a 10 MGD upgrade to existing water treatment facility, to include new rapid mix/pre-chemical structure, new sludge blanket clarifier, four (4) new dual media filters, new bulk chemical storage facility, new clearwell pumping station, and associated sitework, electrical, instrumentation and controls, and site piping.

 

A Pre-Bid Meeting will be held at 10:30 a.m. on February 25, 2020 in the Backflow Training Building at the Greenville Utilities Commission WTP, located at 1721 Water Way Road, Greenville, NC  27834.  Attendance shall be mandatory for those Pre-Qualified Bidders submitting a Bid.

The Greenville Utilities Commission has adopted a resolution that requires the Commission to solicit minority and women owned businesses to Bid on the Project.  The established goals for this project are a 7% goal for minority participation and 4% goal for women participation.  Bidders are also required to make good faith efforts to secure Bids from Minority and Women Owned Businesses.

The Project will be funded in whole or in part by the Drinking Water State Revolving Fund (DWSRF).  Applicable requirements of the DWSRF shall apply, including, but not limited to, MBE/WBE (DBE) utilization, Davis-Bacon Act, and American Iron and Steel (AIS) provisions.