Request for Quote
For Construction Subcontractor Services and Materials

Sam’s Branch Water Reclamation Facility

CLIENT: Town of Clayton NC
ENGINEER: Gannett Fleming Inc
Project location In vicinity of Johnston County – N. O’Neil Street SR1708 – Clayton, NC 27520

Please reply with your intent or interest to Thalle Construction Co Inc ASAP

SUBCONTRACTOR OFFER DEADLINE: August 30, 2022 02:00 PM Offer may  be emailed to quotes@thalle.com; fax 919-241-1659 Corp Phone 919.245.1490 to Thalle Construction Co Inc. Proposals are encouraged to be on company letterhead, with pricing noting scope inclusions or exclusions, if applicable: bonding rate, MWBE business utilization

• Pre-Bid Meeting & Site Visit – August 10, 2022 (Optional for subcontractors)

Small businesses, minority owned businesses, women owned businesses, and businesses owned by low and moderate-income persons are encouraged to participate MBE goal is 10.9% WBE goal 10.4% This project is being bid in accordance with ARP Act Fiscal Recovery Act, Davis bacon,  Domestic Procurement Preference, EEO, plus other Federal and other contract clauses apply,

Contractors, Services, Materials Sought

  • General: Surveying, temporary bypass pumps
  • Site work, , Erosion-Control, earthwork grading, Storm drainage and ponds, effluent outfall, Concrete flatwork curb & gutter, asphalt pavement, pavement striping, Fencing and gates, Grassing, landscaping-plantings
  • Underground Piping: water & sewer, yard piping, Precast manholes ,
  • Concrete Structures: Cast in place Concrete, forming, reinforcement, readymix, accessories
  • Buildings: stone masonry, Structural Steel, Cold formed steel trusses, Insulation, metal roof panels, PVC roofing, Concrete slabs, metal framing, steel deck, Doors, Windows, Overhead doors, drywall, painting, Acoustical Ceiling, Flooding, fluid applied flooring, interior signage, HVAC, Plumbing, Toilet compartments bath and laundry accessories, first Aid, Extinguishers, Furnishings, laboratory Equipment, lockers, shelving, appliances. Casework, countertops. Bridge crane, Mono rail Hoist
  • Electrical, Underground duct banks, Exterior lighting, building and structure electrical systems Communication, Security systems
  • Process Piping: RCP, DIP FRP Vales and fittings
  • Treatment Equipment, Aluminum Stop logs, hydraulic slide gates, Parshall flume, Automatic Samplers, Screw Conveyors, FRP Tanks, Odor Control Filters, Polymer Blanding Feed, Metering Pumps, Chopper Pumps, mixing Equipment, Clarifier Equipment, Jet aeration, Sludge Coarse Bubble Mix, Process Diffuser, Rotary drum thicker, Centrifugal Pumps, Sludge pumps, Package water pump system

See owner furnished Materials and equipment section 011000 for inclusions exclusions; select DIP, FRP pipe, wall Sleeves, Aerzern Blowers, Bioset Screw Press, Standby Generators, Storm water

Project Scope: The Sam’s Branch Water Reclamation Facility project includes construction and installation of equipment for a  new 6.0 MGD wastewater treatment facility, Overall project compleation 130 weeks from Notice to Proceed Anticipated October 2022; Overall work includes  but not limited to the following:

1. Site work and yard piping
2. Influent pump station
3. Screening and grit removal facility
4. Equalization storage and pump station
5. Aeration basins, mixed liquor distribution, WAS handling, process drain pump station
6. Blower and main electrical building
7. Secondary clarifiers (three)
8. Return activated sludge pump station
9. Chemical feed installations
10. Tertiary disk filters
11. UV Disinfection
12. Cascade Aeration
13. Plant drain pump station
14. Electrical improvements and SCADA controls
15. Solids handling facility and holding tanks
16.  Buildings
• Admin, BLDG, 5,419 SF
• Electrical Blower maintenance BLDG 7,977 SF
• Electrical BLDG South 2,533 SF
• Influent PS 3,464 SF
• Headworks 8,986 SF
• UV Disinfection BLDG 2,328 SF
• RAS / WAS BLDG 3,740 SF
• Thickening-Dewatering BLG 15,884 SF
• Chemical Storage BLG 2,026 SF
• Sludge holding pump station 936 SF

BID DOCUMENTS Project Special Provisions-Specifications, Plan Drawings, & other documents are available at no cost by download Link: https://securecc.smartinsight.co/#/PublicBidProject/659881 . In addition project documents can be obtained obtained/viewed by appointment at Thalle’s office in Hillsborough NC

CONTRACT COMPLIANCE All contracts and purchase orders will comply with and flow-down project documents requirements, contract clauses, not limited to: qualification; State & Federal laws and regulations Insurance Coverage, Employment Practices, wage obligation, taxes, Civil Rights Acts, Equal Employment,  Business Utilization MBE/WBE/DBE firms are encouraged to participate & will be listed at time of bid, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. Firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements, or to inquiry Thalle’s Insurance requirements, payment terms, pre approval for agreements or quickpay, may contact Thalle Nan Sumner 919.241.1636 nsumner@thalle.com for assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons-based on capabilities.

CONTACTS: Thalle Construction Company Inc.900 NC HWY 86 North Hillsborough 27278 phone 919.241.1490 fax 919.241.1659: Estimating-Dept quotes@thalle.com :

Seth Rowney

Senior Estimator

Thalle Construction Company Inc

srowney@thalle.com; quotes@thalle.com

Direct 919.241.1614  Cell 817.521.5557

Vincent Zannini

Estimating/Engineering Dept

Thalle Construction Company Inc.

vzannini@thalle.com; quotes@thalle.com

Direct 919.241.1635 Cell 919.201.0864