Calendar

Loading Events

« All Events

  • This event has passed.

VIRTUAL SUBCONTRACTING EVENT/ P197 AIRCRAFT MAINTENANCE HANGAR AND PARKING GARAGE

October 5

VIRTUAL SUBCONTRACTING EVENT:

P197 AIRCRAFT MAINTENANCE HANGAR AND PARKING GARAGE

                                                                                         

The North Carolina Military Business Center will host a virtual subcontracting event for the P197 Aircraft Maintenance Hangar and Parking Garage project with both Walsh Construction from 0900-1100 and BL Harbert International from 1300-1500 on October 5, 2021.

Project Name: P197 Aircraft Maintenance Hangar and Parking Garage

Location: MCAS Cherry Point, Havelock, NC

Estimated Magnitude: $100,000,000 and $250,000,000

Scope: This project constructs a two story low rise two squadron module Type 1 maintenance hangar for the F-35B Lightning II aircraft including a high bay space, crew and equipment space, and administrative space. The building will be concrete masonry unit on a pile supported reinforced concrete slab-on-grade foundation with structural steel framing, steel roof trusses and pre-finished insulated metal roof. Special construction features include 400Hz and 270v DC power, aircraft maintenance work stations, hanger work station kiosks, alarm systems, communication connections at aircraft parking locations, seismic construction, hazardous material storage areas, explosive material storage areas, sound attenuation, and vaults. Project includes taxiway remarking and the renovation to existing aircraft parking aprons in order to provide electrical grounding, work station kiosks and sun shades.

The hangar administrative space includes a special access program facility area for secured handling/storage of classified material/components up to top secret classification and pilot brief and debrief rooms.  Other primary facilities include an aircraft parking apron and cybersecurity features.  A parking structure for approximately 1,700 vehicles will be provided.

List of potential Subcontracting Opportunities:  

  • Div 2: Abatement & Demolition
  • Div 3: CIP Concrete
  • Div 4: Unit Masonry
  • Div 5: Structural Steel; Misc. Metals
  • Div 6: Rough Carpentry; Finish Carpentry
  • Div 7: Air Barrier; SSMR; Joint Sealants/Expansion Joints
  • Div 8: Doors/Frames/Hardware; Overhead Coiling Doors; Steel Sliding Hangar Doors; Storefronts, Curtainwall, Glazing; Translucent Panels
  • Div 9: Flooring (tile, terrazzo, resilient, carpet); Resinous Epoxy Flooring Coating; Raised Access Flooring; Paint & Coatings; Metal Stud Framing/Gyp/ACT
  • Div 10-12: (Visual Display Units, Signage, Window Treatments, Toilet Compartments, Wall Protection, Toilet Accessories, Lockers, Entrance Matts, Bird Control Devices, Site Furnishings)
  • Div 14: Elevators
  • Div 21: Fire Protection (including AFFF)
  • Div 22: Plumbing
  • Div 23: HVAC
  • Div 26-28: Electrical
  • Div 31: Earthwork; Soil Treatment for Subterranean Termite; Deep Foundations; Fence and Gates; Landscaping
  • Div 41: Bridge Cranes

CONTACTS FOR SUBCONTRACTING PORTALS, ETC.

BL Harbert International, Hunter Craton: HCraton@blharbert.com. Solicitation available the week of October 4th, pricing documents the week of October 11th, and pricing due from Subcontractors and Vendors by 2:00pm on October 27th.

The Walsh Group, Anthony DeCarlo: adecarlo@walshgroup.com