Calendar

Loading Events

« All Events

  • This event has passed.

Wharton-Smith, Inc./ 210 Wastewater Treatment Facility for Johnston County, North Carolina

October 5

Wharton-Smith is a general contractor who is soliciting proposals from State of North Carolina HUB MBE and WBE subcontractors & suppliers for the 210 Wastewater Treatment Facility for Johnston County, North Carolina. This project is scheduled to bid on Tuesday, October 5, 2021 at 2:00 PM. Please submit your proposed scope of work to us at least 24 hours prior to the bid date & your firm pricing for that scope of work to us by 8:00 am on bid day. Proposals may be emailed to envestimating@whartonsmith.com, &/or phoned in to 407-321-8410.

Bidding documents are available for free download via www.isqft.com. If you would like to receive a copy of the Plans, Specs, & Addenda, please email your request including your company’s name & contact information to dwalters@whartonsmith.com, or call 704-525-5695 ext. 5301. Please be sure to provide the project name in the subject line. Upon receiving your email, we will send you an Invitation-to-Bid, which provides a link to the project via www.isqft.com. The iSqFt website will provide instructions on how to log in & view or download the bidding documents. Please do not hesitate to contact Danielle Walters (704-525-5695 ext. 5301) with any questions you might have regarding the use of the “iSqFt” website. Please feel free to contact us should you need assistance reviewing the Contract plans & specs. Bidding Documents are also available for viewing at our Charlotte division office located at 5601 Seventy Seven Center Drive, Ste. 120, Charlotte, NC 28217. Please call ahead to ensure someone is available to assist you at 704-525-5695.

Project Scope of Work: The Work is located in Smithfield, NC at the 210 WWTF site which is located adjacent to the Johnston County Landfill (680 County Home Road, Smithfield NC 27577). The Work consists of the following: 1. New preliminary treatment facility, 2. New preliminary effluent distribution box, 3. New BNR basins with fine bubble diffusers, mixers, nitrified recycle pumps, waste activated sludge pumps, and process drain pumps, 4. New blower building, 5. New secondary clarifiers, 6. New recycle activated sludge pump station, 7. New chemical storage and feed facility, 8. New drain pump station, 9. New disk filters, 10. New ultraviolet disinfection facility (add alternate), 11. New sodium hypochlorite facility, 12. New effluent pump station, 13. New cascade aerator, 14. New maintenance building, 15. New administration building

Anticipated areas of work that will be subcontracted for this project are:  Surveying, Material Testing, Hauling, Sitework (Demolition, Earthwork, Aggregate Materials, Geotextiles, Clearing, Grubbing, Site Preparation, Excavation by Blasting, Dewatering, Erosion and Sedimentation Control, Paving, Surface Restoration, Steel Fencing, Final Grading and Landscaping), Concrete (Concrete Formwork, Concrete Accessories, Joints in Concrete, Reinforcing Steel, Stressing Tendons, Cast-in-Place Concrete, Concrete Finishes, Concrete Curing, Precast Concrete, Precast Concrete Specialties, Grout), Masonry (Mortar and Masonry Grout, Masonry Accessories, Unit Masonry and Cast Stone), Metals (Galvanizing, Metal Fastening, Metal Materials, Structural Steel, Stainless Steel, Structural Aluminum, Steel Joists, Metal Decking, Metal Fabrications, Metal Stairs, Ladders, Handrails and Railings, Gratings, Access Hatches, and Access Doors, Stair Treads and Nosings, Castings, Bearing Devices and Anchoring), Woods, Plastics and Composites (Rough Carpentry, Finish Carpentry, Glass Fiber and Resin Fabrications), Thermal and Moisture Protection (Dampproofing, Waterproofing, Building Insulation, Vapor Barrier, Flashing and Sheet Metal, Standing Seam Metal Roofing and Wall Panels, Joint Fillers, Sealants and Caulking), Openings (Steel Doors and Frames, Wood Doors, Roll-up Doors, Aluminum Storefront, Translucent Wall Assemblies, Finish Hardware, Glass and Glazing, Louvers and Dampers), Finishes (Gypsum Drywall System, Ceramic Tile, Acoustical Ceiling System, Resilient Flooring, Acoustical Panel System, Painting, Polyurethane MIC Coatings) Specialties (Visual Display Boards, Identifying Devices, Metal Toilet Partitions, Toilet and Bath Accessories, First Aid Cabinets, Fire Extinguishers, Metal Lockers, Canopies), Furnishings (Window Treatment, Steel Laboratory Cabinets and Accessories), Special Construction (Aluminum Flat Covers, Metal Buildings, Fire Alarm System), Plumbing, HVAC, Process Piping, and Electrical.

If your company requires our help to establish a specific scope of work, which is economically feasible & realistic for your company, and/or if you feel a scope of work is too large for your firm to handle individually, please do not hesitate to contact us.

Please advise us should your company require special accommodations with payment terms, bonding, or insurance in order to provide pricing for this project. Depending on the type of subcontract work, we may also be able to waive subcontractor bonding requirements to make it easier for your company to quote the work. We can also provide assistance to qualified minority businesses in need of equipment, loan capital, lines of credit, or joint pay agreements to secure loans, supplies, or letters of credit, including waiving credit that is ordinarily required. If establishing loan capital or lines of credit to purchase materials to be installed on this project is an impediment to your company bidding work, we will gladly work with your material suppliers to set up joint check agreements or assist in obtaining the same unit pricing as our suppliers to enable you to bid this project.

Wharton-Smith, Inc. will offer “Quick Pay Commitment” to all MWBE’s to assist qualified minority businesses with their cash flow, which means a commitment to pay MWBE’s within 20 days after the Contractor confirms that the work has been performed & completed properly. Should the terms of this policy be unacceptable for your company, we will gladly negotiate terms; however these agreements should be complete prior to bid date.

Wharton-Smith, Inc. is willing to review any responsible quote & will negotiate terms, if appropriate.  Any other questions regarding this project may be directed to Walters, 704-525-5695 Ext. 5301 or dwalters@whartonsmith.com.

Details

Date:
October 5
Event Category: