Loading Events

« All Events

  • This event has passed.

Wharton-Smith/ Water Supply Improvements Project for Davie County Public Utilities, NC

September 15, 2022

Wharton-Smith is a general contractor who is soliciting proposals from the State of North Carolina HUB, DOT, & DOA Certified MBE and WBE (MWBE) subcontractors & suppliers for the Water Supply Improvements Project for Davie County Public Utilities, North Carolina. This project is scheduled to bid on Thursday, September 15, 2022, at 2:00 PM. Please submit your proposed scope of work to us at least 24 hours prior to the bid date & your firm pricing for that scope of work to us by 10:00 am on bid day. Proposals may be emailed to envestimating@whartonsmith.com.

Bidding documents are available for free download via www.isqft.com. If you would like to receive a copy of the Plans, Specs, and Addenda, please email us (envestimating@whartonsmith.com) your request, including your company’s contact information. Please be sure to provide the project name in the subject line. Upon receiving your email, we will send you an Invitation to Bid containing a link to the project via www.isqft.com. The “iSqft” website will provide instructions on logging in and viewing or downloading the bidding documents. Please do not hesitate to contact Nichole Voitel with any questions you might have regarding the use of the “iSqft” website.

Project Scope of Work: This project consists of the following: (1) A 16-inch raw water transmission main extending from the existing Primary Raw Water Pump Station to the new Cooleemee Water Treatment Plant, (2) Upgrades to the existing Primary and Secondary Raw Water Pump Stations (including new pumps, piping, and electrical facilities), (3) Demolition of the existing Cooleemee WTP, (4) Construction of 12-inch and 16-inch water mains along Main Street, Gladstone Street, and Highway 601 including fittings and valves, fire hydrants, bore and jack trenchless crossings, erosion and sedimentation control, and other miscellaneous restoration, (5) Greenfield Cooleemee Water Treatment Plant with the following facilities: (a) Conventional surface water treatment process facilities (rapid mix, flocculation, sedimentation, filtration), (b) Ultraviolet reactors (duty/standby) for multiple barrier pathogen disinfection, (c) Dual-cell clear well, (d) High Service Pump Station equipped with duty/standby High Service Pumps and a duty Backwash Supply Pump, (e) Chemical storage and feed building, (f) Backwash equalization tank, (g) Administration building including offices and a process laboratory, (h) Standby Generator, (i) Miscellaneous yard piping

Anticipated areas of work that will be subcontracted for this project are:  Surveying, Materials Testing, Traffic Control, Hauling, Sitework (Demolition, Removal of Existing Structures & Equipment, Hazardous Materials Abatement), Concrete (Concrete Formwork, Concrete Accessories, Joints in Concrete, Reinforcing Steel, Stressing Tendons, Cast-in-Place Concrete, Concrete Finishes, Concrete Curing, Precast Concrete, Precast Prestressed Concrete Hollow Core Planks, Precast Concrete Specialties, Grout), Masonry (Masonry Contractor, Mortar & Masonry Grout, Masonry Accessories, Unit Masonry), Metals (Galvanizing, Metal Fastening, Metal Materials, Structural Steel, Stainless Steel, Structural Aluminum, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Ladders, Guards & Railings, Gratings, Checkered Floor Plates, & Access Doors, Stair Treads & Nosings, Castings, Bearing Devices & Anchoring), Woods, Plastics and Composites (Rough Carpentry, Structural Insulated Panels, Finish Carpentry, Glass Fiber and Resin Fabrications), Thermal and Moisture Protection (Damproofing, Crystalline Waterproofing, Building Insulation, Vapor Barrier, Single Ply Membrane Roofing (PVC or KEE), Flashing & Sheet Metal, Roof Specialties & Accessories, Firestopping, Joint Fillers, Sealants & Caulking), Openings (Steel Doors & Frames, Wood Doors, Fiberglass Doors & Frames, Roll-Up Doors, Aluminum Storefront, Translucent Wall Assemblies, Aluminum Windows & Frames, Translucent Skylight Assemblies, Finish Hardware, Glass & Glazing, Louvers & Dampers), Finishes (Gypsum Drywall System, Ceramic Tile, Acoustical Ceiling Tile, Resilient Flooring, Resinous Flooring, Acoustical Pane System, Painting Contractor), Specialties (Visual Display Boards, Identifying Devices, Metal Toilet Partitions, Toilet & Bath Accessories, First Aid Cabinets, Fire Extinguishers , Metal Lockers, Canopies, Flagpole), Furnishings (Window Treatment, Wood Laboratory Cabinet & Accessories), Special Construction (Pre-Engineered Metal Buildings), Plumbing, HVAC, Process Piping, and Electrical

If your company requires our help to establish a specific scope of work, which is economically feasible & realistic for your company, and/or if you feel a scope of work is too large for your firm to handle individually, please do not hesitate to contact us.

Please advise us should your company require special accommodations with payment terms, bonding, or insurance in order to provide pricing for this project. Depending on the type of subcontract work, we may also be able to waive subcontractor bonding requirements to make it easier for your company to quote the work. We can also provide assistance to qualified minority businesses in need of equipment, loan capital, lines of credit, or joint pay agreements to secure loans, supplies, or letters of credit, including waiving credit that is ordinarily required. If establishing loan capital or lines of credit to purchase materials to be installed on this project is an impediment to your company bidding work, we will gladly work with your material suppliers to set up joint check agreements or assist in obtaining the same unit pricing as our suppliers to enable you to bid this project.

Wharton-Smith, Inc. will offer a “Quick Pay Commitment” to all MWBEs to assist qualified minority businesses with their cash flow, which means a commitment to pay MWBEs within 20 days after the Contractor confirms that the work has been performed & completed properly. Should the terms of this policy be unacceptable for your company, we will gladly negotiate terms; however, these agreements should be complete prior to the bid date.

Wharton-Smith, Inc. is willing to review any responsible quote and will negotiate terms, if appropriate. Any other questions regarding this project may be directed to Nichole Voitel, 407-321-8410 Ext. 3622 or nvoitel@whartonsmith.com.

Details

Date:
September 15, 2022
Event Category:

Leave a Comment