Winston-Salem Forsyth County Utilities – Water Transmission System

May 19

Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for all work and/or materials on the following project:
Project Name: Winston-Salem Forsyth County Utilities – Water Transmission System Improvements Near Thomas Water Treatment Plant and Winston-Salem State University   Contract B    DMP Project # 080037    City of Winston Salem Project #: 708761
Bid Date: Tuesday, May 20, 2025 @ 2:00 PM
Please provide your proposal by: 05-19-25 @ 5:00 PM
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: pipe work, cast in place concrete, seeding and mulching, air test sewer mains, temporary sewer bypass pumping, vacuum testing, sewer/water/carrier pipe, excavation, hauling, clearing and grubbing, concrete work, traffic control, dust control, storm manholes, grading, water mains, retaining wall, greenway platform, ditch lining. Or work may include, but not limited to filter fabric underlayment, removal of sand and sediment, double arch culverts, water treatment plant, valves, boring and jacking, excelsior matting, silt fence, site grading, stone, demolition, fencing and gates, temporary earth berm, temporary entrances, trenchless installations, water transmission main construction, sediment trap, steel pipe work, patching a repairs, installation of embedded items & other incidental Items necessary for construction to complete the project.
Construction of approximately 3,185 L.F. of 30-inch diameter and 200 L.F. of 24-inch diameter finished water transmission main and appurtenances, and approximately 100 L.F. Of 48-inch diameter encasement pipe trenchless methods.
The work performed under this Contract shall include but may not be limited to: The furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.
Please contact Daniel Lynch at [email protected] if you have any questions on the job link below.  
The following link will provide you with digital Plans and Specs
https://www.dropbox.com/scl/fo/zsgo9w86cm3q470jchde9/AD1pHnm4ANVRBUxDrmwCWyY?rlkey=dh08ew8smasjy54yu6mg4b8f7&st=3oayzzsu&dl=0
You may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn, NC.
Contract documents, including Drawings and Technical Specifications, are on file and may be reviewed at the following locations:
Duncan Parnell Company, Inc. – https://bidroom.duncan-parnell.com/       On April 22, 202 bidding documents can be obtained in printed or digital form from the bid room link above, for the non-refundable price as listed on their website. All payments are made via their bid room. If you need assistance ordering or getting registered email [email protected]  Neither Owner nor engineer has any responsibility for the accuracy, completeness, or sufficiency of any Bidding Documents obtained from any other source other than the Issuing Office.
JRL is willing to review any responsible quote and will negotiate terms, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 5-27-2025 and I will inform you of the status of your bid. If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance.
Bonding:  It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will get you in contact with our Bonding Agent.
Financial Assistance:  Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
Quick Payments:  It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.
Please contact me at [email protected] with any questions
 JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047    Fax: 336-368-4613

Details

Date:
May 19
Event Category: