BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.14.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:theinstitutenc.org
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250820T090000
DTEND;TZID=America/New_York:20251001T110000
DTSTAMP:20260429T235750
CREATED:20260203T152024Z
LAST-MODIFIED:20260203T152024Z
UID:10000280-1755680400-1759316400@theinstitutenc.org
SUMMARY:Finance Forward: 7-Week Financial Mastery Cohort for Entrepreneurs
DESCRIPTION:Finance Forward: 7-week cohort for full-time business owners (3+ yrs\, $50K+ revenue). Starts August 20. Apply now-limited space.\n\n\nFinance Forward is a comprehensive 7-week Financial Mastery Cohort tailored for full-time entrepreneurs seeking to strengthen their financial acumen and strategically scale their businesses. The program includes three in-person sessions on August 20\, September 10th\, and October 1 at 5800 Faringdon Place\, Raleigh\, NC\, complemented by four virtual workshops on August 27\, September 3\,17\, and 24\, all held on Wednesdays from 9:00 AM to 11:00 AM. \nParticipants will benefit from expert-led instruction and peer collaboration\, gaining practical tools to effectively manage cash flow\, pricing strategies\,capital readiness\, and financial forecasting. This cohort is designed for growth-oriented business owners committed to advancing their financial management and overall business success. \nEligibility Requirements: \n\nMinimum of three years in business\nAnnual revenue exceeding $50\,000\nFull-time business ownership\n\nEnrollment is limited to 15 participants. Registration does not guarantee acceptance; all applicants will be reviewed. \nApplications are now open for the August 20 – October 1\, 2025 session.
URL:https://theinstitutenc.org/event/finance-forward-7-week-financial-mastery-cohort-for-entrepreneurs/
LOCATION:5800 Faringdon Pl\, 5800 Faringdon Place\, Raleigh\, NC\, 27609\, United States
CATEGORIES:Events
ATTACH;FMTTYPE=image/jpeg:https://theinstitutenc.org/wp-content/uploads/2025/08/e549dea9bb21bc43a90004f718230fbd.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20250924
DTEND;VALUE=DATE:20250925
DTSTAMP:20260429T235750
CREATED:20250917T172248Z
LAST-MODIFIED:20250917T172248Z
UID:10000372-1758672000-1758758399@theinstitutenc.org
SUMMARY:REBID - Jonesville – Water Line Improvements
DESCRIPTION:Jimmy R. Lynch & Sons\, Inc. An Equal Employment Opportunity Contractor\, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race\, Color\, Religion\, Sex\, or National Origin and is Soliciting Bids for M/WBE Participation.\nWe would appreciate a quotation from your firm for all work and/or materials on the following project:\nProject Name: REBID – Jonesville – Water Line Improvements\n \nBid Date: Wednesday\, September 24th\, 2025 @ 2:00 PM\n \nPlease provide your proposal by: 09-23-25 @ 5:00 PM\n \nWe are soliciting subcontract bids for the following trades. Work may include\, but not limited to: Clearing and grubbing where necessary\, traffic control\, temporary removal and restoration or temporary support of\, but not limited to\, existing mailboxes\, signs\, fences\, shrubs\, plants (under 6 feet in height)\, guard rails\, power and telephone poles\, excavating\, shoring and bracing where required\, dewatering as required\, installing\, backfilling (including Class I material as specified for the pipe bedding\, haunching\, and initial backfill)\, installation of warning / identification tape over utilities\, Installation of tracer wire on non-metallic utilities\, temporary support and protection of existing underground facilities\, pipe\, concrete blocking and encasement\, connection to existing piping\, fittings\, and restrained joint fittings\, flushing and testing\, repair to damaged new and existing utilities\, adjust existing and new valve boxes to finished surface elevations\, cutting and removal of existing paved surfaces\, patching of existing paved surfaces shall be paid as indicated elsewhere\, grade disturbed areas to original surface profile prior to seeding\, clean up and seeding\, water line installation\, erosion control\, painting\, water work\, erosion control\, rock excavation\, grout fill\, asphalt repair\, insertion valves\, hauling\, concrete\, gravel\, brick and stone\, silt fence\, along with any incidentals and materials necessary for construction to complete the project.\n \nThe Project includes the following Work:\n1) Installation of 2\,989 LF of 8” PVC C900 water line and associated appurtenances.\n2) Installation of 3\,745 LF of 6” PVC C900 water line and associated appurtenances.\n3) Installation of (9) 12-inch and (1) 8-inch insertion valves on existing mains.\n4) Replacement of 1\,282 water services from main to meter.\n    a. Includes replacement of meter box\, meter setter and backflow preventer.\n    b. Existing services to be abandoned after installation of new service.\n \nThe work performed under this Contract shall include but may not be limited to: The furnishing of all labor\, materials\, equipment and services\, whether specifically mentioned or not\, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.\n \nPlease contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions on the job link below.  \n \nThe following link will provide you with digital Plans and Specs\nhttps://www.dropbox.com/scl/fo/9ei10hl5spvaam7wtrkyr/AMj429z6j2QJ_3yB87DC9cg?rlkey=98k5wf1yvvplsnfcgvzl7gz0g&st=hn2f305j&dl=0\n \nYou may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn\, NC.\n \nContract documents\, including Drawings and Technical Specifications\, are on file and may be reviewed at the following locations:\n \nProspective Bidders may examine the Bidding Documents as follows:\nThe Issuing Office and Owner’s Office on Monday through Friday between the hours of 9 am and 4 pm.\n \nOwner: Town of Jonesville\n              1503 NC HWY 67\n               Jonesville\, NC 28642\n \nEngineer & Issuing Office for Bidding Documents:\nThe Wooten Company\n119 Brookstown Avenue\, Suite 100\nWinston-Salem\, NC 27101\n336.722.5326\nAttention of Ms. Lisa Bradshaw (lbradshaw@thewootencompany.com) at the issuing office\n \nOr\n \nDodge Construction (online)\nConstruct Connect (online)\nNorth American Procurement Council\, Inc. (online)\n \nJRL is willing to review any responsible quote and will negotiate terms\, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below\, if you have not heard from JRL by 10-01-2025 and I will inform you of the status of your bid.  \n \nIf you need assistance with equipment\, obtaining bonding\, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification\, (if you are not certified.) loan capital\, lines of credit\, insurance or joint pay agreements\, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. \n \nNo M/WBE firms were rejected due to lack of qualifications.  No negotiations were needed.  All M/WBE subcontractors’ quotes are considered\, and none were rejected without sound reason.\n \nBonding:  It is Jimmy R. Lynch & Sons\, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons\, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons\, Inc Performance & Payment Bonds to the Owner.\n \nIf you would like to obtain a bond on this project to help build your bonding capacity\, please let us know through email\, phone call or specifying on your quote and we will get you in contact with our Bonding Agent. \n \nFinancial Assistance:  Jimmy R. Lynch & Sons\, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.\n \nQuick Payments:  It is Jimmy R. Lynch & Sons\, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons\, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.\nPlease contact me at dlynch@jrlynchandsons.com with any questions\n JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  \nPlease Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047    Fax: 336-368-4613
URL:https://theinstitutenc.org/event/rebid-jonesville-water-line-improvements/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR