BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.16.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
DTSTAMP:20260906T092151
CREATED:20260820T181109Z
LAST-MODIFIED:20260904T185816Z
UID:10000579-1790553600-1790639999@theinstitutenc.org
SUMMARY:Hertford WWTP Rehabilitation
DESCRIPTION:The project will consist of the rehabilitation and replacement of multiple items at the Hertford Wastewater Treatment Plant (WWTP). Work at the headworks will include replacement of the grit removal system\, one (1) influent pump\, one (1) VFD\, and modifications to the associated electrical. The oxidation ditch modifications will include concrete rehabilitation of the structure\, as well as replacement of three (3) mud valves\, three (3) knife gates\, three (3) sluice gates\, a weir gate\, and a rotating plate weir. The oxidation ditch will also be fitted with two additional catwalks to allow for maintenance of the brush aerators. Modifications to the splitter box will include the replacement of all three (3) of the slide gates. The telescoping valve in the sludge holding basin will be removed and replaced. The fine bubble aeration system will be replaced in the aerobic digester. At the chlorine contact basin and effluent pump station the disc filters will be removed\, the two (2) slide gates will be replaced\, three (3) check valves will be replaced\, one (1) effluent pump\, three (3) VFDs\, and the associated electrical. Replacing the SCADA and the addition of a security system are also included under this project. \nBid Documents Link: https://www.questcdn.com/cdn/posting/10332299/?path=269\,332&search_id=
URL:https://theinstitutenc.org/event/hertford-wwtp-rehabilitation/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
DTSTAMP:20260906T092151
CREATED:20260904T131843Z
LAST-MODIFIED:20260904T131843Z
UID:10000584-1790553600-1790639999@theinstitutenc.org
SUMMARY:Suppliers/Subcontractors Wanted: Town of Hertford - Hertford Wastewater Treatment Plant Rehabilitation
DESCRIPTION:D/M/WBE\nSUBCONTRACTORS/SUPPLIERS WANTED \nT. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE\, MBE\, and WBE subcontractors and suppliers for the Hertford Wastewater Treatment Plant Rehabilitation project for the Town of Hertford which bids on September 28\, 2026\, at 2:00 PM.  Plans and specifications for this project are available at the following locations: T. A. Loving Company; 400 Patetown Road; Goldsboro\, NC 27530 * WithersRavenel; 167 East Chatham Street; Cary\, NC 27511 * QuestCDN website. \nPotential subcontracting opportunities include but are not limited to surveying\, demolition\, clearing and grubbing\, hauling\, earthwork\, erosion control\, seeding\, sodding\, electrical\, SCADA\, bypass pumping\, dewatering\, CIPC\, concrete forms\, concrete rebar\, and painting. Please contact the Civil Infrastructure Estimating Team (infrastructure@taloving.com) if you are interested in submitting a proposal on any portion(s) of this project.  Contact via phone 919-734-8400; fax: 919-736-2148; or email. All quotations will be accepted up to the closing time of the bid date. T. A. Loving Company is an Equal Opportunity/Affirmative Action Employer. \nPlease advise if assistance is needed with obtaining necessary equipment\, supplies\, materials\, or insurance/bonding to satisfy the work requirements. We are willing to accept quotations for all or partial quantities and items of work. We can offer 2-party check payments and quick payment agreements\, but the agreements need to be negotiated prior to the bid date.
URL:https://theinstitutenc.org/event/suppliers-subcontractors-wanted-town-of-hertford-hertford-wastewater-treatment-plant-rehabilitation/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR