BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.14.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251008
DTEND;VALUE=DATE:20251009
DTSTAMP:20260429T232141
CREATED:20250917T173759Z
LAST-MODIFIED:20250917T173759Z
UID:10000378-1759881600-1759967999@theinstitutenc.org
SUMMARY:Statesville – SVH South Development Area
DESCRIPTION:Jimmy R. Lynch & Sons\, Inc. An Equal Employment Opportunity Contractor\, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race\, Color\, Religion\, Sex\, or National Origin and is Soliciting Bids for M/WBE Participation.\nWe would appreciate a quotation from your firm for all work and/or materials on the following project:\nProject Name: Statesville – SVH South Development Area\n \nBid Date:  Tuesday\, 10-8-2025  @ 2:00 PM\n \nPlease provide your proposal by: 10-9-2025 @ 5:00 PM\n \nWe are soliciting subcontract bids for the following trades. Work may include\, but not limited to: demolition\, quality control\, mulching\, aggregate base course\, asphalt concrete surface course\, intermediate course\, concrete work\, hauling\, rip rap\, pipe work\, erosion control\, landscaping\, pipe/manhole/waterline/gravity sewer/gate/fence/pavement/electrical & light pole removal\, automated vehicle gate\, temporary slope drain\, chain link fence\, excavation\, concrete pipework\, hazard marking\, lighting and signing\, barricades\, concrete form work\, reinforcement\, horizontal directional drilling\, precast manhole\, top soil\, temporary seeding\, aircraft storage hanger along with any incidentals and materials necessary for construction to complete the project.\n \nThe Project includes the following Work: This project can generally be described as the partial construction of a taxilane\, provide sites for additional hangar sites\, the construction of parking areas for the proposed and future hangars\, the installation of a stormwater drainage system\, and a stormwater control system.\n \nThe work performed under this Contract shall include but may not be limited to: The furnishing of all labor\, materials\, equipment and services\, whether specifically mentioned or not\, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.\n \nPlease contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions on the job link below.  \n \nThe following link will provide you with digital Plans and Specs\nhttps://www.dropbox.com/scl/fo/jwqru7sbn5jmmuoxwduk0/ACWxKeWkinqsM-tkGTBHoTg?rlkey=ttceglpuiadhtv8mqhac8asi2&st=vtf290a5&dl=0\n \nContract documents\, including Drawings and Technical Specifications\, are on file and may be reviewed at the following locations: JRL Office @ 314 S. Academy St. Pilot Mtn\, NC 27041\n \nOr\n \nat the office of the engineer: PARRISH AND PARTNERS OF NC\, PLLC 1801 Stanley Road\, Suite 315 Greensboro\, North Carolina 27407 336-944-6880 ATTN: Cindy Pearce\n \nJRL is willing to review any responsible quote and will negotiate terms\, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below\, if you have not heard from JRL by 10-15-2025 and I will inform you of the status of your bid.  \n \nIf you need assistance with equipment\, obtaining bonding\, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification\, (if you are not certified.) loan capital\, lines of credit\, insurance or joint pay agreements\, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. \n \nNo M/WBE firms were rejected due to lack of qualifications.  No negotiations were needed.  All M/WBE subcontractors’ quotes are considered\, and none were rejected without sound reason.\n \nBonding:  It is Jimmy R. Lynch & Sons\, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons\, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons\, Inc Performance & Payment Bonds to the Owner.\n \nIf you would like to obtain a bond on this project to help build your bonding capacity\, please let us know through email\, phone call or specifying on your quote and we will get you in contact with our Bonding Agent. \n \nFinancial Assistance:  Jimmy R. Lynch & Sons\, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.\n \nQuick Payments:  It is Jimmy R. Lynch & Sons\, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons\, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.\nPlease contact me at dlynch@jrlynchandsons.com with any questions\n JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  \nPlease Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047    Fax: 336-368-4613
URL:https://theinstitutenc.org/event/statesville-svh-south-development-area/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251008
DTEND;VALUE=DATE:20251009
DTSTAMP:20260429T232141
CREATED:20251003T163119Z
LAST-MODIFIED:20251003T163119Z
UID:10000394-1759881600-1759967999@theinstitutenc.org
SUMMARY:Digester HVAC Improvements
DESCRIPTION:LAUGHLIN-SUTTON CONSTRUCTION COMPANY\nGeneral Contractors Since 1958\nAn Affirmative Action Employer in compliance with\n41 CFR 60-1.4(d)\, 60-250.22 and 60-741.22\nINVITATION TO BID\nDigester\nHVAC Improvements\nSOLICITING BIDS FOR THE FOLLOWING: Roofing\, Fiberglass Doors and Hardware\, HVAC\, and electrical.\nBID DATE/TIME: October 8\, 2025@ 2:00 PM SCOPE DUE: October 7\, 2025\nJob Description: The project consists of demolishing an existing rooftop air handling unit and duct heater and select ductwork at Digesters No. 3 and No. 4\, providing a replacement rooftop air handling unit and duct heater with new and modified ductwork\, providing multiple exhaust fans for adjacent stairwells\, electrical work to support new equipment \, installing duct smoke detectors with an allowance for controls integration\, replacing the roof of the digester building and stairwells\, and all associated appurtenances as described in the Specifications and as shown in the Drawings. \nBid Document: LS Bid Invite_ Digester HVAC Improvements
URL:https://theinstitutenc.org/event/digester-hvac-improvements/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR