BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.14.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260107
DTEND;VALUE=DATE:20260108
DTSTAMP:20260429T210107
CREATED:20260106T182243Z
LAST-MODIFIED:20260106T182243Z
UID:10000433-1767744000-1767830399@theinstitutenc.org
SUMMARY:Gibsonville\, NC / Hwy. 61 Waterline Connector 
DESCRIPTION:Jimmy R. Lynch & Sons\, Inc. An Equal Employment Opportunity Contractor\, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race\, Color\, Religion\, Sex\, or National Origin and is Soliciting Bids for M/WBE Participation.\nWe would appreciate a quotation from your firm for any and all work and/or materials on the following project:\nProject Name: Gibsonville- Hwy. 61 Waterline Connector \nBid Date: Wednesday\, January 7\, 2026 @ 2:00 PM \n Please provide your proposal by: 01-06-26 @ 5:00 PM\nWe are soliciting subcontract bids for the following trades. Work may include\, but not limited to: Pipe Work\, Water\, Packaged Booster Pump\, Pavement Removal\, Paving Repair\, Electrical\, Variable Frequency Drive System w/ Bypass\, Hauling\, Clearing & Grubbing\, Erosion Control\, Traffic Control\, Temporary Construction Entrance\, Concrete Work\, Concrete Curing\, Concrete Formwork\, Cast-in-Place Concrete\, Precast Concrete Structures\, Concrete Slab Finishing\, Stone\, Rip Rap\, Seeding\, Mulching\, Site Grading/Clearing\, Metal Fabrication\, Anchor Bolts & Anchors\, Chain Link Fencing\, Gates\, Quality Control\, Excavation Support & Protection\, Curb & Gutter\, Dewatering\, Rock Excavation\, Storm Drainage\, Lawns & Grasses\, Boring and Jacking\, Constructions Facilities & Temporary Controls\, Materials & Equipment\, Engine-Generator Systems\, Trenching & Excavation for Utilities Structures\, along with any incidentals and materials necessary for construction to complete the project.\nThe proposed work will consist of the installation of new water infrastructure in the vicinity of NC Highway 61 in Gibsonville\, North Carolina. The primary work will include the following items and appurtenances:\n1. Installation of approximately 8\,440 LF 12” DIP Water\, including open cut and bore & jack installation\n 2. Installation of approximately 3\,700 LF 16” DIP Water\, including open cut and bore and jack installation under the NCRR corridor\n 3. Connection to existing 12” and 8” waterline\nThe work performed under this Contract shall include but may not be limited to the furnishing of all labor\, materials\, equipment and services\, whether specifically mentioned or not\, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.\nPlease contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions about the project or submitting a proposal.\nThe following link will provide you with the digital Plans and Specs:\nhttps://www.dropbox.com/scl/fo/jm2msef3xvls7n1bs8fp7/AF7N4yDBnZ1BX5sxIMWaB5Q?rlkey=obgm96o4ne89fmx4au7le41g6&st=c0g9x09y&dl=0\nYou may view plans & specs at the following location:  JRL Office @ 314 S. Academy St. Pilot Mtn\, NC.  Or\nEngineer. Alley\, Williams\, Carmen & King\, Inc.\n740 Chapel Hill Road\nBurlington\, NC 27215\nAttention: Mr. Brent Mills\, P.E.\nTelephone: (336) 226-5534\nOwner. Town of Gibsonville\n104 S. Williamson Ave.\nGibsonville\, NC 27244\nAttention: Mr. Rob Elliot\, Public Works Director\nTelephone: (336) 584-9600\n All bids must be in accordance with the Bidding Documents on file at the office of Alley\, Williams\, Carmen & King\, Inc.\nJRL is willing to review any responsible quote and will negotiate terms\, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below\, if you have not heard from JRL by 01-14-2026 and I will inform you of the status of your bid.   If you need assistance with equipment\, obtaining bonding\, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification\, (if you are not certified.) loan capital\, lines of credit\, insurance or joint pay agreements\, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. \nBonding:  It is Jimmy R. Lynch & Sons\, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons\, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons\, Inc Performance & Payment Bonds to the Owner.\nIf you would like to obtain a bond on this project to help build your bonding capacity\, please let us know through email\, phone call or specifying on your quote and we will put you in contact with our Bonding Agent. \nFinancial Assistance:  Jimmy R. Lynch & Sons\, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.\nQuick Payments:  It is Jimmy R. Lynch & Sons\, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons\, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.\nJRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  \nPlease Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047   Fax: 336-368-4613\nThank you!
URL:https://theinstitutenc.org/event/gibsonville-nc-hwy-61-waterline-connector/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR