BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.18.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:theinstitutenc.org
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260910
DTEND;VALUE=DATE:20260911
DTSTAMP:20260824T135647Z
CREATED:20260824T135647Z
LAST-MODIFIED:20260824T135647Z
UID:10000580-1788998400-1789084799@theinstitutenc.org
SUMMARY:Bethel Booster Pump Station Relocation - Lincoln Co.\, NC
DESCRIPTION:We are requesting quotations for the following trades/disciplines:\nSELECTIVE DEMOLITION\nCONCRETE\nDOORS & WINDOWS\nHAULING\nMASONRY\nDRYWALL\nCLEARING & GRUBBING\nROUGH CARPENTRY\nSCADA & CONTROLS\nEROSION CONTROL\nFLUID APPLIES MEMBRANE AIR BARRIER\nPAINTING & COATINGS\nBORE & JACK\nDAMPROOFING\nELECTRICAL\nASPHALT & CONCRETE PAVING\nINSULATION\nPLUMBING\nLANDSCAPING & GRASSING\nMETAL ROOFING\nHVAC\nSITEWORK\nCAULKING & SEALANT
URL:https://theinstitutenc.org/event/bethel-booster-pump-station-relocation-lincoln-co-nc/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260910
DTEND;VALUE=DATE:20260911
DTSTAMP:20260825T191157Z
CREATED:20260825T191157Z
LAST-MODIFIED:20260825T191157Z
UID:10000581-1788998400-1789084799@theinstitutenc.org
SUMMARY:Clinton-Joaana WWTP EQ Basin & Clarifier Improvements
DESCRIPTION:As a General Contractor\, we invite you to submit your proposals for the following project-   \nPROJECT:	Clinton-Joanna WWTP EQ Basin & Clarifier Improvements\n	BID DATE:   		9/10/2026 @ 2pm\n	OWNER:       	City of Newberry\n	ENGINEER:    	KCI Technologies\, Inc. \nCONTRACT DOCUMENTS MAY BE EXAMINED AT THE FOLLOWING LOCATIONS- \n•	Turner Murphy Company\, Inc. – 2500 Southway Dr.\, Rock Hill\, SC 29730\n•	Engineer’s office – 106 Clair Drive\, Piedmont\, SC 29673\n•	Owner’s office – 1330 College St.\, Newberry\, SC 29108 \nWe will be accepting Subcontractor Proposals on the following:\nElectrical\, Paining\, Welding\, Dumpsters\, and Portable Toilets.\nPlease submit PRICING QUOTES BY September 9\, 2026. \nPlease include a copy of your certification with your quote.\nWe encourage and solicit HUB Certified MBE/WBE firms and intend to seriously negotiate for project participation and are willing to review any responsible quote and negotiate terms. Bidders must comply with Executive Order 11246 and 11375 in order to ensure equal opportunity. This contract is subject to the Davis-Bacon and Related Acts(DBRA). MBE/WBE participation goals are 10%.  A Drug Free Workplace and Non-Discrimination Workplace Policy are required. Quick pay agreements will be provided to meet cashflow demands. \nRobert Murphy rmurphy@turnermurphy.com is the estimator for this project.  Please contact him if you have any questions or need any information.  Phone: 803-328-3874.
URL:https://theinstitutenc.org/event/clinton-joaana-wwtp-eq-basin-clarifier-improvements/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260916
DTEND;VALUE=DATE:20260917
DTSTAMP:20260914T164014Z
CREATED:20260914T164014Z
LAST-MODIFIED:20260914T164014Z
UID:10000585-1789516800-1789603199@theinstitutenc.org
SUMMARY:Cannons Creek WWTP Improvements
DESCRIPTION:Please see the below dropbox link to the plans and specs.\nhttps://www.dropbox.com/scl/fo/4ky41tnv8j8p7ml9tbh8c/AHyfQSTQ3rKqS1FUFlkApOY?rlkey=b6wkuj2yb3cwial1fn05a4gdm&dl=0
URL:https://theinstitutenc.org/event/cannons-creek-wwtp-improvements/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260924
DTEND;VALUE=DATE:20260925
DTSTAMP:20260904T131820Z
CREATED:20260904T131820Z
LAST-MODIFIED:20260904T131820Z
UID:10000583-1790208000-1790294399@theinstitutenc.org
SUMMARY:Method Community Park Improvements Project
DESCRIPTION:Exterior restoration of building envelope. New accessible front Pioneers Building entry preserves\nexisting historic stoop. Updates to building systems to support new and existing primary function\nof programmed spaces\, including electrical\, mechanical\, IT\, AV\, fire alarm\, security\, and\nplumbing. Interior renovations provide new finishes throughout\, as well as acoustic enhancements\nin the multi-purpose room. Existing history room to receive new exhibit content. Multi-purpose\nspace has alternate to install raised access flooring which would eliminate need for interior\nramping for accessibility and provide underfloor building systems distribution. Base bid and\nalternate designs are provided for the history room and catering kitchen. The building will be fully\nADA compliant following renovation. Sitework will include a new playground\, splash pad\, parking\nlot rework\, parking lot lighting\, irrigation\, stormwater treatment and service upgrades.
URL:https://theinstitutenc.org/event/method-community-park-improvements-project/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
DTSTAMP:20260904T185816Z
CREATED:20260820T181109Z
LAST-MODIFIED:20260904T185816Z
UID:10000579-1790553600-1790639999@theinstitutenc.org
SUMMARY:Hertford WWTP Rehabilitation
DESCRIPTION:The project will consist of the rehabilitation and replacement of multiple items at the Hertford Wastewater Treatment Plant (WWTP). Work at the headworks will include replacement of the grit removal system\, one (1) influent pump\, one (1) VFD\, and modifications to the associated electrical. The oxidation ditch modifications will include concrete rehabilitation of the structure\, as well as replacement of three (3) mud valves\, three (3) knife gates\, three (3) sluice gates\, a weir gate\, and a rotating plate weir. The oxidation ditch will also be fitted with two additional catwalks to allow for maintenance of the brush aerators. Modifications to the splitter box will include the replacement of all three (3) of the slide gates. The telescoping valve in the sludge holding basin will be removed and replaced. The fine bubble aeration system will be replaced in the aerobic digester. At the chlorine contact basin and effluent pump station the disc filters will be removed\, the two (2) slide gates will be replaced\, three (3) check valves will be replaced\, one (1) effluent pump\, three (3) VFDs\, and the associated electrical. Replacing the SCADA and the addition of a security system are also included under this project. \nBid Documents Link: https://www.questcdn.com/cdn/posting/10332299/?path=269\,332&search_id=
URL:https://theinstitutenc.org/event/hertford-wwtp-rehabilitation/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
DTSTAMP:20260904T131843Z
CREATED:20260904T131843Z
LAST-MODIFIED:20260904T131843Z
UID:10000584-1790553600-1790639999@theinstitutenc.org
SUMMARY:Suppliers/Subcontractors Wanted: Town of Hertford - Hertford Wastewater Treatment Plant Rehabilitation
DESCRIPTION:D/M/WBE\nSUBCONTRACTORS/SUPPLIERS WANTED \nT. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE\, MBE\, and WBE subcontractors and suppliers for the Hertford Wastewater Treatment Plant Rehabilitation project for the Town of Hertford which bids on September 28\, 2026\, at 2:00 PM.  Plans and specifications for this project are available at the following locations: T. A. Loving Company; 400 Patetown Road; Goldsboro\, NC 27530 * WithersRavenel; 167 East Chatham Street; Cary\, NC 27511 * QuestCDN website. \nPotential subcontracting opportunities include but are not limited to surveying\, demolition\, clearing and grubbing\, hauling\, earthwork\, erosion control\, seeding\, sodding\, electrical\, SCADA\, bypass pumping\, dewatering\, CIPC\, concrete forms\, concrete rebar\, and painting. Please contact the Civil Infrastructure Estimating Team (infrastructure@taloving.com) if you are interested in submitting a proposal on any portion(s) of this project.  Contact via phone 919-734-8400; fax: 919-736-2148; or email. All quotations will be accepted up to the closing time of the bid date. T. A. Loving Company is an Equal Opportunity/Affirmative Action Employer. \nPlease advise if assistance is needed with obtaining necessary equipment\, supplies\, materials\, or insurance/bonding to satisfy the work requirements. We are willing to accept quotations for all or partial quantities and items of work. We can offer 2-party check payments and quick payment agreements\, but the agreements need to be negotiated prior to the bid date.
URL:https://theinstitutenc.org/event/suppliers-subcontractors-wanted-town-of-hertford-hertford-wastewater-treatment-plant-rehabilitation/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
DTSTAMP:20260918T182448Z
CREATED:20260918T182448Z
LAST-MODIFIED:20260918T182448Z
UID:10000587-1790553600-1790639999@theinstitutenc.org
SUMMARY:Hertford WWTP Rehabilitation
DESCRIPTION:The project will consist of the rehabilitation and replacement of multiple items at the Hertford Wastewater\nTreatment Plant (WWTP). Work at the headworks will include replacement of the grit removal system\, one (1)\ninfluent pump\, one (1) VFD\, and modifications to the associated electrical. The oxidation ditch modifications will\ninclude concrete rehabilitation of the structure\, as well as replacement of three (3) mud valves\, three (3) knife\ngates\, three (3) sluice gates\, a weir gate\, and a rotating plate weir. The oxidation ditch will also be fitted with two\nadditional catwalks to allow for maintenance of the brush aerators. Modifications to the splitter box will include\nthe replacement of all three (3) of the slide gates. The telescoping valve in the sludge holding basin will be removed\nand replaced. The fine bubble aeration system will be replaced in the aerobic digester. At the chlorine contact\nbasin and effluent pump station the disc filters will be removed\, the two (2) slide gates will be replaced\, three (3)\ncheck valves will be replaced\, one (1) effluent pump\, three (3) VFDs\, and the associated electrical. Replacing the\nSCADA and the addition of a security system are also included under this project.
URL:https://theinstitutenc.org/event/hertford-wwtp-rehabilitation-2/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260929
DTEND;VALUE=DATE:20260930
DTSTAMP:20260914T163851Z
CREATED:20260914T163851Z
LAST-MODIFIED:20260914T163851Z
UID:10000586-1790640000-1790726399@theinstitutenc.org
SUMMARY:Morganton Water Treatment Plant Raw Water Weir Abutment Wall Repair
DESCRIPTION:State Utility Contractors\, Inc. solicits material and subcontract bids for the following work: SELECT DEMOLITION\, CONCRETE REPAIR\, PAINTING & COATINGS\, HAULING\, EXCAVATION\, EROSION CONTROL\, CLEARING & GRUBBING\, GRADING\, SODDING & SEEDING\, and Material Supply for Morganton Water Treatment Plant\nRaw Water Weir Abutment Wall Repair project\, located at Morganton\, NC.  The bid date for this project is September 29\, 2026\, at 2:00 PM EST.  Minority & Women Owned Businesses are encouraged to submit proposals for this work.  If additional information is needed\, please contact Bill Williams at (704) 289-6400.  EOE  M/F
URL:https://theinstitutenc.org/event/morganton-water-treatment-plant-raw-water-weir-abutment-wall-repair/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261006
DTEND;VALUE=DATE:20261111
DTSTAMP:20261006T190945Z
CREATED:20261006T190945Z
LAST-MODIFIED:20261006T190945Z
UID:10000594-1791244800-1794355199@theinstitutenc.org
SUMMARY:RFP Grant Administration Services - CDBG-I WWTP Rehabilitation
DESCRIPTION:The Town of Belhaven has received a Community Development Block Grant – Infrastructure (CDBG-I) award in the amount of $3\,000\,000 by the North Carolina Department of Environmental Quality (NCDEQ) and a Clean Water State Revolving Fund (CWSRF) loan of $3\,000\,000 for Town of Belhaven Waste Water Treatment Plant Rehabilitation.\nThe project will consist of conducting like-for-like rehabilitation/replacement on the Waste Water Treatment Plant (WWTP) located at 488 Plant Road\, Belhaven\, North Carolina. The project will make improvements to the headworks\, influent pump station\, rapid mix basin\, aeration basin and systems\, clarifier\, tertiary filter\, UV basin\, final aeration basin\, solids processing\, old SCADA system\, and add cybersecurity. This project is co-funded with the Division of Water Infrastructure (DWI) State Revolving Funds (SRF).  Construction must be completed by June 7\, 2029.\nContingent upon this award\, the Belhaven Board of Aldermen is soliciting proposals for grant administration services to assist the Town in the administration and management of this project in compliance with all applicable requirements under the North Carolina CDBG-I Program.  The fee for grant administration services will be paid with CDBG-I funds.\nScope of Services:\nGrant administration services shall include\, but are not limited to\, standard tasks necessary for the implementation of the project in conformance with the following CDBG compliance areas:\n1.	Environment Review Compliance and Release of Funds and other Funding Conditions;\n2.	Citizen Participation Compliance;\n3.	Fair Housing Compliance;\n4.	Equal Employment and Procurement Compliance;\n5.	Section 3 Compliance;\n6.	Section 504 Compliance;\n7.	Completion of Language Access Plan;\n8.	Completion of Anti-Displacement and Relocation Assistance Plan;\n9.	Complaints and Grievance Procedures for Compliance Plans;\n10.	Labor Standards Compliance;\n11.	Completion of all required reports and documentation;\n12.	Assistance with Financial Reimbursements Forms; and\n13.	Setting up and managing official records.\nThe services will not include the disbursement or account of funds distributed by the Town’s financial officer\, legal advice\, fiscal audits\, or assistance with activities not related to the CDBG-I project.\nProposal Submission:\nSubmissions provided to the Town shall include at a minimum:\n1.	Individual or Firm Information: the consultant or firm’s legal name\, address\, email\,  and telephone number\, the principal(s) of the firm and their experience and qualifications;  \n2.	CDBG Grant Administration Experience: description of specialized experience and technical competence of the staff to be assigned to the project with respect to CDBG grant administration\, description of firm’s prior experience\, including any similar projects (in particular those funded by CDBG)\, size of community\, location\, total construction cost\, and name of local official knowledgeable regarding the firm’s performance.  Include at least three references;  \n3.	Consultant / Firm Capability:  description of firm’s current work activities\, capability of carrying out all aspects of CDBG related activities\, and firm’s anticipated availability during the term of the project; \n4.	Cost of Services: Indicate a fee for service and explanation of the basis for the fee; and  \n5.	Documentation of compliance with state and federal debarment/ eligibility requirements.\nProposal Evaluation Criteria:\nProposals for grant administrative services will be evaluated by a Selection Committee. Proposals will be considered on an equal competitive basis.  The following criteria will be used in the evaluation process: [Identify the criteria that shall receive priority weighting in the final selection\, in addition to fee].\n1.	CDBG-I Grant Administration Experience (25 points)\nEvaluation will be based on the firm’s experience in administering CDBG-I grants\, including the qualifications and technical competence of the staff assigned to the project. Consideration will be given to the firm’s prior experience with similar CDBG-I-funded projects\, including project size\, location\, and community context. \n2.	Consultant/Firm Capability (20 points)\nEvaluation will focus on the firm’s ability to handle all aspects of the CDBG-I project\, including current workload\, capacity to meet project demands\, and availability of the firm during the project term. This will also consider the firm’s track record for timely completion of similar projects. \n3.	Cost of Services (20 points)\nEvaluation will be based on the proposed fee for service\, including the reasonableness of the fee in relation to the scope of services provided and the justification for the proposed costs \n4.	Technical Approach and Project Schedule (20 points)\nEvaluation will be based on the proposed approach to managing the project and the clarity and feasibility of the project schedule. This includes how the firm plans to meet the project’s objectives while adhering to all compliance requirements and deadlines. \n5.	Completeness of Submission (15 points)\nEvaluation will be based on the thoroughness and organization of the submission\, including\nwhether all required documents and information have been provided in accordance with the submission guidelines. \nUpon completion of the review\, the Committee will make its recommendation to the Town for approval.\nRespondents may review the CDBG-I application which includes a description of the proposed project including activities\, budget\, schedule\, and other pertinent information by visiting the Town’s website\, www.TownofBelhaven.com\, or Town offices at 315 E. Main Street\, Belhaven offices during regular office hours.\nThe above information should be submitted via email no later than Tuesday\, November 10\, 2026\, by 4PM.   For more information\, contact Sierra Alligood\, Town Clerk\, at 252-943-3055.  Submissions should be emailed to townclerk@townofbelhaven.com.\nThe Town of Belhaven is an Equal Opportunity Employer and invites the submission of proposals from small and minority and women-owned firms\, veteran-owned\, historically underutilized businesses\, and certified/registered Section 3 businesses concerns.\nThis information is available in Spanish or any other language upon request. Please contact Sierra Alligood at 252-943-3055 or at 315 E. Main Street\, Belhaven\, NC for accommodation for this request.\nEsta información está disponible en español o en cualquier otro idioma bajo petición. Por favor\, póngase en contacto con Sierra Alligood al 252-943-3055 o en 315 East Main Street\, Belhaven\, NC de alojamiento para esta solicitud.
URL:https://theinstitutenc.org/event/rfp-grant-administration-services-cdbg-i-wwtp-rehabilitation/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261007
DTEND;VALUE=DATE:20261008
DTSTAMP:20260903T131912Z
CREATED:20260903T131912Z
LAST-MODIFIED:20260903T131912Z
UID:10000582-1791331200-1791417599@theinstitutenc.org
SUMMARY:ONWASA Dixon WTP Brine Tank Replacement
DESCRIPTION:The project will consist of removing and replacing the existing brine tank #1 and connecting\nto existing piping. The existing tank site glass and level control assembly will be reused on\nthe new brine tank. The new brine tank shall be completely automatic and self-contained\nsalt storage and salt dissolving unit for producing fully saturated brine from rock\, solar or\nevaporated salt products capable of producing 20 to 35 gallons per minute of saturated brine\nflow under normal operating conditions. To minimize disruptions to ongoing plant operations\,\nthe awarded Bidder shall procure and secure delivery of the tank prior to initiating any\nconstruction activities on the project site. Due to the anticipated long lead time associated\nwith tank fabrication\, the awarded Bidder shall proactively coordinate with ONWASA and\nthe Engineer to provide routine updates on procurement activities\, manufacturing progress\,\nanticipated delivery dates\, and schedule impacts to ensure alignment with the overall project\ntimeline. Upon delivery of the tank to the project site\, ONWASA will accept and approve\npayment for the tank\, and the Contractor shall commence construction activities on the first\ncalendar day following delivery and shall diligently prosecute the Work to completion. All\nWork shall be completed within ninety (90) consecutive calendar days following delivery of\nthe tank to the project site.
URL:https://theinstitutenc.org/event/onwasa-dixon-wtp-brine-tank-replacement/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261007
DTEND;VALUE=DATE:20261008
DTSTAMP:20261008T140326Z
CREATED:20261008T140326Z
LAST-MODIFIED:20261008T140326Z
UID:10000596-1791331200-1791417599@theinstitutenc.org
SUMMARY:Historic Yates Mill County Park Renovation
DESCRIPTION:This project consists of a renovation at the existing Historic Yates Mill County Park located at 4620 Lake Wheeler Road in Raleigh\, North Carolina. The proposed renovations include renovations to the existing Visitor Center\, a new Maintenance Facility with storage yard\, a new picnic shelter and plaza\, parking improvements with bus parking spaces\, improved sidewalks throughout the site\, overlooks along the pond\, and other miscellaneous improvements.
URL:https://theinstitutenc.org/event/historic-yates-mill-county-park-renovation/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261008
DTEND;VALUE=DATE:20261009
DTSTAMP:20261005T155453Z
CREATED:20261005T155445Z
LAST-MODIFIED:20261005T155453Z
UID:10000590-1791417600-1791503999@theinstitutenc.org
SUMMARY:City of Sanford: Jackson Heights CDBG-NR
DESCRIPTION:D/M/WBE\nSUBCONTRACTORS/SUPPLIERS WANTED \nT. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE\, MBE\, and WBE subcontractors and suppliers for the Jackson Heights CDBG-NR project for the City of Sanford which bids on October 8\, 2026\, at 10:00 AM.  Plans and specifications for this project are available at the following locations: T. A. Loving Company; 400 Patetown Road; Goldsboro\, NC 27530 * City of Sanford\, Engineering Department; 225 East Weatherspoon Street; Sanford\, NC 27330 * J. Thomas Engineering\, Inc.; 143 Charlotte Avenue\, Suite 104; Sanford\, NC 27330. \nPotential subcontracting opportunities include but are not limited to surveying\, demolition\, clearing & grubbing\, hauling\, asphalt paving\, striping\, traffic control\, earthwork\, erosion control\, seeding\, sodding\, landscaping\, linework/pipe installation\, bypass pumping\, and flatwork. Please contact the Conveyance Estimating Group (conveyancebids@taloving.com) if you are interested in submitting a proposal on any portion(s) of this project.  Contact via phone 919-734-8400; fax: 919-736-2148; or email. All quotations will be accepted up to the closing time of the bid date. T. A. Loving Company is an Equal Opportunity/Affirmative Action Employer. \nPlease advise if assistance is needed with obtaining necessary equipment\, supplies\, materials\, or insurance/bonding to satisfy the work requirements. We are willing to accept quotations for all or partial quantities and items of work. We can offer 2-party check payments and quick payment agreements\, but the agreements need to be negotiated prior to the bid date.
URL:https://theinstitutenc.org/event/city-of-sanford-jackson-heights-cdbg-nr/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261009
DTEND;VALUE=DATE:20261010
DTSTAMP:20261006T140555Z
CREATED:20261006T140555Z
LAST-MODIFIED:20261006T140555Z
UID:10000591-1791504000-1791590399@theinstitutenc.org
SUMMARY:Grand Strand Water and Sewer Authority: Bucksport Wastewater Treatment Plant 42-Inch Effluent Force Main
DESCRIPTION:D/M/WBE\nSUBCONTRACTORS/SUPPLIERS WANTED \nT. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE\, MBE\, and WBE subcontractors and suppliers for the Bucksport Wastewater Treatment Plant 42-Inch Effluent Force Main project for the Grand Strand Water and Sewer Authority which bids on October 9\, 2026\, at 11:30 AM.  Plans and specifications for this project are available at the following locations: T. A. Loving Company; 400 Patetown Road; Goldsboro\, NC 27530 * Hazen and Sawyer; 720 North 3rd Street\, Suite 501; Wilmington\, NC 28401 * Bid Net Direct website.  \nPotential subcontracting opportunities include but are not limited to surveying\, clearing and grubbing\, erosion control\, seeding\, and flatwork. Please contact the Conveyance Estimating Group (conveyancebids@taloving.com) if you are interested in submitting a proposal on any portion(s) of this project.  Contact via phone 919-734-8400; fax: 919-736-2148; or email. All quotations will be accepted up to the closing time of the bid date. T. A. Loving Company is an Equal Opportunity/Affirmative Action Employer. \nPlease advise if assistance is needed with obtaining necessary equipment\, supplies\, materials\, or insurance/bonding to satisfy the work requirements. We are willing to accept quotations for all or partial quantities and items of work. We can offer 2-party check payments and quick payment agreements\, but the agreements need to be negotiated prior to the bid date.
URL:https://theinstitutenc.org/event/grand-strand-water-and-sewer-authority-bucksport-wastewater-treatment-plant-42-inch-effluent-force-main/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261013
DTEND;VALUE=DATE:20261014
DTSTAMP:20261006T140505Z
CREATED:20261006T140505Z
LAST-MODIFIED:20261006T140505Z
UID:10000593-1791849600-1791935999@theinstitutenc.org
SUMMARY:Caldwell County Wilson Creek Visitor Center
DESCRIPTION:This project involves floodplain re-grading\, restoration of the adjacent unnamed tributary\, repair of the gravel parking lot\, re-installation of damaged park infrastructure\, and re-establishment of drainage through the site that was destroyed during tropical storm Helene. This includes stabilizing 724 linear feet of overbank area along Wilson Creek. Channel restoration to the Unnamed Tributary to Wilson Creek that is present on the site will include replacing the two damaged undersized circular culverts with a single bottomless arch culvert and a restored natural channel with bankfull bench.
URL:https://theinstitutenc.org/event/caldwell-county-wilson-creek-visitor-center/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261014
DTEND;VALUE=DATE:20261015
DTSTAMP:20261005T155530Z
CREATED:20261005T155530Z
LAST-MODIFIED:20261005T155530Z
UID:10000589-1791936000-1792022399@theinstitutenc.org
SUMMARY:Mayodan WTP Inclined Plate Settlers
DESCRIPTION:The installation of an inclined plat settling including all required demolition\, retrofit and coordination with the existing structure to insure a complete sytem. The project will also include the installation of new flocculation mixers and all required electrical work.  We are looking for subcontractors to assist with concrete saw cutting and electrical.
URL:https://theinstitutenc.org/event/mayodan-wtp-inclined-plate-settlers/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
DTSTAMP:20261006T140913Z
CREATED:20261005T155549Z
LAST-MODIFIED:20261006T140913Z
UID:10000588-1792022400-1792108799@theinstitutenc.org
SUMMARY:Town of Mayodan Water Treatment Plant Inclined Plate Settlers Project
DESCRIPTION:The installation of an inclined plate settling system including all required demolition\, retrofit and coordination with the existing structure to insure a complete system. The project will also include the installation of new flocculation mixers\, and all required electrical work. This work will be performed at the Town of Mayodan Water Treatment Plant located at 500 W. Roach Street\, Mayodan\, North Carolina\, 27027 \nWe are requesting quotations for the following trades/disciplines:\nSELECTIVE DEMOLITION\nSTRUCTURAL STEEL\nPAINTING & COATING\nHAULING DEBRIS\nGRASSING & SEEDING\nELECTRICAL\nEROSION CONTROL\nSCADA & CONTROLS
URL:https://theinstitutenc.org/event/town-of-mayodan-water-treatment-plant-inclined-plate-settlers-project/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261022
DTSTAMP:20261006T140534Z
CREATED:20261006T140534Z
LAST-MODIFIED:20261006T140534Z
UID:10000592-1792540800-1792627199@theinstitutenc.org
SUMMARY:Neuse River Resource Recovery Facility BNR Basins MCC Replacement
DESCRIPTION:• Demolition and in-kind replacement of MCC-P4B\, MCC-P5B\, and MCC-P6B.\n• Demolition and replacement of PLC-81\, PLC-82\, and PLC-83 cabinets.\n• New prefabricated metal enclosure with walls\, roof\, doors\, lighting\, and HVAC system to house new MCC and PLC.\n• Extension of existing concrete foundation to accommodate new enclosure footprint.\n• Demolition and replacement of all power wire cable within existing conduit from each MCC to each motor and device on BNR Aeration Basins 1-6.\n• Demolition and replacement of sections of corroded electrical conduit from each MCC to each motor and device on BNR Aeration Basins 1-6.
URL:https://theinstitutenc.org/event/neuse-river-resource-recovery-facility-bnr-basins-mcc-replacement/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261028
DTEND;VALUE=DATE:20261029
DTSTAMP:20261007T203413Z
CREATED:20261007T203413Z
LAST-MODIFIED:20261007T203413Z
UID:10000595-1793145600-1793231999@theinstitutenc.org
SUMMARY:Jackson County Middle School - BP3100 Turnkey Site Development
DESCRIPTION:Buchanan and Sons Inc is requesting quotes from DBE/MBE/WBE/HUB/HUB Contractors and Suppliers for the Jackson County Middle School Project (Bid Package 3100 – Turnkey Site Development) located in Sylva\, NC.\nSubcontract items and materials include but are not limited to the following: Surveying\, Hauling\, Clearing & Grubbing\, Erosion Control\, Temporary Construction Fencing\, Aggregate Base Course\, Asphalt Paving\, Concrete Curb & Sidewalks\, Pavement Markings\, Seeding & Mulching\, Sewer Bypass Pumping\, Water Taps\, Bore & Jack\, Miscellaneous Materials\, Miscellaneous Appurtenances. \nDBE/MBE/WBE/HUB SUBCONTRACTORS AND SUPPLIERS ARE STRONGLY ENCOURAGED TO PARTICIPATE. \nBuchanan and Sons Inc is committed to:\n Assisting interested DBE/MBE/WBE/HUB in obtaining bonding\, lines of credit\, and insurance.\n Providing interested DBE/MBE/WBE/HUB technical assistance or information related to the plans\, specifications\, and requirement for work to be subcontracted or supplied by these DBE/MBE/WBE/HUB.\n Assisting interested DBE/MBE/WBE/HUB in obtaining necessary equipment\, supplies\, materials\, or related assistance or services.\n Sub-dividing items into economical and feasible work units to allow DBE/MBE/WBE/HUB every advantage to quoting the project.\n Providing quick pay agreements and policies to enable DBE/MBE/WBE/HUB to meet cash flow demands. \nPRE-BID: TUESDAY\, OCTOBER 13TH\, 2026 AT 10:00AM (ON-SITE)\nQUESTIONS DUE TO BSI: THURSDAY\, OCTOBER 15TH\, 2026 AT 12:00PM\nBIDS DUE TO BSI: WEDNESDAY\, OCTOBER 28TH\, 2026 @ 12:00PM \nQUOTATIONS CAN BE EMAILED TO estimator@bsi-construction.com\, MAILED TO PO BOX 123\, WHITTIER\, NC 28789 OR FAXED TO 828-497-9721. \nAll questions or comments for this project can be directed to:\nMr. Tom Edge (Estimator) or Mrs. Jessica Lewis (Office Administrator) by phone at (828) 497-9720\, fax at (828) 497-9721\, or by email at estimator@bsi-construction.com. \nPlease advise us of your intent to bid as soon as possible by emailing estimator@bsi-construction.com.
URL:https://theinstitutenc.org/event/jackson-county-middle-school-bp3100-turnkey-site-development/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR