BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.16.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:theinstitutenc.org
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260910
DTEND;VALUE=DATE:20260911
DTSTAMP:20260826T044249
CREATED:20260825T191157Z
LAST-MODIFIED:20260825T191157Z
UID:10000581-1788998400-1789084799@theinstitutenc.org
SUMMARY:Clinton-Joaana WWTP EQ Basin & Clarifier Improvements
DESCRIPTION:As a General Contractor\, we invite you to submit your proposals for the following project-   \nPROJECT:	Clinton-Joanna WWTP EQ Basin & Clarifier Improvements\n	BID DATE:   		9/10/2026 @ 2pm\n	OWNER:       	City of Newberry\n	ENGINEER:    	KCI Technologies\, Inc. \nCONTRACT DOCUMENTS MAY BE EXAMINED AT THE FOLLOWING LOCATIONS- \n•	Turner Murphy Company\, Inc. – 2500 Southway Dr.\, Rock Hill\, SC 29730\n•	Engineer’s office – 106 Clair Drive\, Piedmont\, SC 29673\n•	Owner’s office – 1330 College St.\, Newberry\, SC 29108 \nWe will be accepting Subcontractor Proposals on the following:\nElectrical\, Paining\, Welding\, Dumpsters\, and Portable Toilets.\nPlease submit PRICING QUOTES BY September 9\, 2026. \nPlease include a copy of your certification with your quote.\nWe encourage and solicit HUB Certified MBE/WBE firms and intend to seriously negotiate for project participation and are willing to review any responsible quote and negotiate terms. Bidders must comply with Executive Order 11246 and 11375 in order to ensure equal opportunity. This contract is subject to the Davis-Bacon and Related Acts(DBRA). MBE/WBE participation goals are 10%.  A Drug Free Workplace and Non-Discrimination Workplace Policy are required. Quick pay agreements will be provided to meet cashflow demands. \nRobert Murphy rmurphy@turnermurphy.com is the estimator for this project.  Please contact him if you have any questions or need any information.  Phone: 803-328-3874.
URL:https://theinstitutenc.org/event/clinton-joaana-wwtp-eq-basin-clarifier-improvements/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260925T140000
DTEND;TZID=America/New_York:20260925T140000
DTSTAMP:20260826T044249
CREATED:20260820T181109Z
LAST-MODIFIED:20260820T181109Z
UID:10000579-1790344800-1790344800@theinstitutenc.org
SUMMARY:Hertford WWTP Rehabilitation
DESCRIPTION:The project will consist of the rehabilitation and replacement of multiple items at the Hertford Wastewater Treatment Plant (WWTP). Work at the headworks will include replacement of the grit removal system\, one (1) influent pump\, one (1) VFD\, and modifications to the associated electrical. The oxidation ditch modifications will include concrete rehabilitation of the structure\, as well as replacement of three (3) mud valves\, three (3) knife gates\, three (3) sluice gates\, a weir gate\, and a rotating plate weir. The oxidation ditch will also be fitted with two additional catwalks to allow for maintenance of the brush aerators. Modifications to the splitter box will include the replacement of all three (3) of the slide gates. The telescoping valve in the sludge holding basin will be removed and replaced. The fine bubble aeration system will be replaced in the aerobic digester. At the chlorine contact basin and effluent pump station the disc filters will be removed\, the two (2) slide gates will be replaced\, three (3) check valves will be replaced\, one (1) effluent pump\, three (3) VFDs\, and the associated electrical. Replacing the SCADA and the addition of a security system are also included under this project.
URL:https://theinstitutenc.org/event/hertford-wwtp-rehabilitation/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR