BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.16.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260611
DTEND;VALUE=DATE:20260612
DTSTAMP:20260816T231611
CREATED:20260528T190334Z
LAST-MODIFIED:20260528T190334Z
UID:10000565-1781136000-1781222399@theinstitutenc.org
SUMMARY:Greensboro\, NC / Bunker Hill Road & Gray Wilson Road Water Line
DESCRIPTION:immy R. Lynch & Sons\, Inc. An Equal Employment Opportunity Contractor\, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race\, Color\, Religion\, Sex\, or National Origin and is Soliciting Bids for M/WBE Participation. \nWe would appreciate a quotation from your firm for all work and/or materials for the following project: \nProject Name:  Greensboro (Guilford County) –Bunker Hill Road & Gray Wilson Road Water Line Improvements\, Contract No. 2019-009B \nBid Date: Thursday\, June 11\, 2026 @ 2:00 PM \nPlease provide your proposal by: 6-10-26 @ 5:00 PM \nWe are soliciting subcontract bids for the following trades. Work may include\, but not limited to: Asphalt\, Pavement Marking\, Boring & Jack\, Traffic Control\, Utilities\, Concrete\, Erosion Control\, Clearing & Grubbing\, Demolition\, Hauling\, Seeding & Mulching and Septic along with any incidentals & materials necessary for construction to complete the project. \nThe work in this contract consists of largely 8”. 12” and 16” water line installation by trenching\, and bore and jack methods with traditional appurtenances \nThe work performed under this Contract shall include but may not be limited to: The furnishing of all labor\, materials\, equipment and services\, whether specifically mentioned or not\, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina & all pertinent administrative regulations shall apply to this project as if herein written out in full.\nPlease contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions on the job link below.   \nThe following Dropbox link will provide you with the digital Specs & Plans \nhttps://www.dropbox.com/scl/fo/43zmyodwv71gl8dj8p4hb/AJEEej3eLXynBQ9XwKnUY70?rlkey=3fcu3jvi4ov4mkqjo8xe2hpdt&st=44rirz8z&dl=0 \nYou may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn\, NC.  Also\, Bidding Documents also may be examined at the following locations & All work will be in accordance with the Plans and Specifications which are on file in the office of “The City of Greensboro”\, Contact Ms. Kristen Kollgaard: Engineering Division\, 300 West Washington Street\, Suite 322\, Greensboro\, North Carolina 27401\, telephone: (336) 437-7966\, fax: (336) 373-2338\, or email: engbids@greensboro-nc.gov \nJRL is willing to review any responsible quote & will negotiate terms\, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below\, if you have not heard from JRL by 6-18-2026 & I will inform you of the status of your bid.   If you need assistance with equipment\, obtaining bonding (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification\, (if you are not certified.) loan capital\, lines of credit\, insurance or joint pay agreements\, please see JRL terms below or contact us & we will review your needs and direct you to available agencies for assistance.  \nBonding:  It is Jimmy R. Lynch & Sons\, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons\, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons\, Inc Performance & Payment Bonds to the Owner. \nIf you would like to obtain a bond on this project to help build your bonding capacity\, please let us know through email\, phone call or specifying on your quote and we will put you in contact with our Bonding Agent.  \nFinancial Assistance:  Jimmy R. Lynch & Sons\, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties. \nQuick Payments:  It is Jimmy R. Lynch & Sons\, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons\, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner. \nJRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.   \nPlease Submit Quote the Day Prior to Bid Opening. \nPhone: 336-368-4047 Fax: 336-368-4613 
URL:https://theinstitutenc.org/event/greensboro-nc-bunker-hill-road-gray-wilson-road-water-line/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260722T080000
DTEND;TZID=America/New_York:20260722T170000
DTSTAMP:20260816T231611
CREATED:20260728T164844Z
LAST-MODIFIED:20260728T164844Z
UID:10000570-1784707200-1784739600@theinstitutenc.org
SUMMARY:Jessie Drive Phase 1
DESCRIPTION:Terrahawk\, LLC is taking bids from DBE\, SBE\, and MBE firms for the Construction of a 2 Lane Undivided Road with 10 Foot Side Path on either side of road. Work will consist of Erosion Control\, Selective Clearing\, Storm Drain and Waterline Installation\, Hauling\, Asphalt Paving\, Concrete Curb and Gutter as well as Flatwork. All interested firms can review plans through the following link. All bids should be submitted by email to bmitchell@terrahawknc.com no later than 9:00 AM 7/22/26. \nhttps://www.dropbox.com/t/fJ9H5DtQODrgZ79M
URL:https://theinstitutenc.org/event/jessie-drive-phase-1/2026-07-22/1/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260722T090000
DTEND;TZID=America/New_York:20260722T090000
DTSTAMP:20260816T231611
CREATED:20260728T164844Z
LAST-MODIFIED:20260728T164844Z
UID:10000571-1784710800-1784710800@theinstitutenc.org
SUMMARY:Jessie Drive Phase 1
DESCRIPTION:Terrahawk\, LLC is taking bids from DBE\, SBE\, and MBE firms for the Construction of a 2 Lane Undivided Road with 10 Foot Side Path on either side of road. Work will consist of Erosion Control\, Selective Clearing\, Storm Drain and Waterline Installation\, Hauling\, Asphalt Paving\, Concrete Curb and Gutter as well as Flatwork. All interested firms can review plans through the following link. All bids should be submitted by email to bmitchell@terrahawknc.com no later than 9:00 AM 7/22/26. \nhttps://www.dropbox.com/t/fJ9H5DtQODrgZ79M
URL:https://theinstitutenc.org/event/jessie-drive-phase-1/2026-07-22/2/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260803
DTEND;VALUE=DATE:20260903
DTSTAMP:20260816T231611
CREATED:20260803T192051Z
LAST-MODIFIED:20260803T192051Z
UID:10000574-1785715200-1788393599@theinstitutenc.org
SUMMARY:Method Community Park Improvements
DESCRIPTION:The Project consists generally of the following major items:\nExterior restoration of building envelope. New accessible front Pioneers Building entry preserves\nexisting historic stoop. Updates to building systems to support new and existing primary function\nof programmed spaces\, including electrical\, mechanical\, IT\, AV\, fire alarm\, security\, and\nplumbing. Interior renovations provide new finishes throughout\, as well as acoustic enhancements\nin the multi-purpose room. Existing history room to receive new exhibit content. Multi-purpose\nspace has alternate to install raised access flooring which would eliminate need for interior\nramping for accessibility and provide underfloor building systems distribution. Base bid and\nalternate designs are provided for the history room and catering kitchen. The building will be fully\nADA compliant following renovation.  Sitework will include a new playground\, splash pad\, parking\nlot rework\, parking lot lighting\, irrigation\, stormwater treatment and service upgrades.
URL:https://theinstitutenc.org/event/method-community-park-improvements/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260804T080000
DTEND;TZID=America/New_York:20260804T110000
DTSTAMP:20260816T231611
CREATED:20260728T162927Z
LAST-MODIFIED:20260728T162927Z
UID:10000572-1785830400-1785841200@theinstitutenc.org
SUMMARY:Brooklyn Neighborhood Water Relocation- Cramerton NC
DESCRIPTION:This project will install approximately 2500 LF of new waterlines in sizes 2-inches thru 8-inches.\nState Utility is requesting quotations for the following trades/disciplines:\nEROSION CONTROL\, TRAFFIC CONTROL\, MATERIAL HAULING\, STONE SUPPLY\, PIPE & MISC. SUPPLY\, SURVEYING\, SEEDING & MULCHING\, ASPHALT PAVING & REPAIRS\, ROCK EXCAVATION\, CLEARING & GRUBBING\, PAVEMENT STRIPING\, FENCE REPAIR\, BORE & JACK\, CONCRETE REPAIR\, CURB & GUTTER\, TAPPING\nThe bid date for this project is 8/4/2026 at 11:00 am. Quotes are due no later than 8/3/2026 by 5:00pm.\nFor more information or to submit a quote\, please contact Kyle Rape at kyle.rape@sucontractors.com or 704-289-6400
URL:https://theinstitutenc.org/event/brooklyn-neighborhood-water-relocation-cramerton-nc/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260811
DTEND;VALUE=DATE:20260812
DTSTAMP:20260816T231611
CREATED:20260729T144648Z
LAST-MODIFIED:20260729T144648Z
UID:10000573-1786406400-1786492799@theinstitutenc.org
SUMMARY:Southport & Fort Fisher Ferry Ramp Backup System
DESCRIPTION:Intercoastal Marine is interested in receiving your quotations on this project for any work and or supplies your company is qualified for. Potential subcontract opportunities which may exist in this project include\, but not limited to installation of a chain hoist system to be used as a backup for the hydraulically operated ferry ramp at Southport and Fort Fisher Ferry’s NC. Suppliers and other items not specifically referenced herein. Documents may be examined at our office 6101 Diamond Shamrock Rd\, Castle Hayne\, NC . We are available to assist you in interpreting the plans and specifications. Historically Underutilized Business\, DBE/WBE/MBE are encouraged to submit a quote. Please call Ben Chontos 910-675-9791 if any questions. Job bids August 11\, 2026\, please submit quotes to ben@imofnc.com or mail@imofnc.com by noon August 10\, 2026
URL:https://theinstitutenc.org/event/southport-fort-fisher-ferry-ramp-backup-system/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260824
DTEND;VALUE=DATE:20260825
DTSTAMP:20260816T231611
CREATED:20260811T200923Z
LAST-MODIFIED:20260811T200923Z
UID:10000577-1787529600-1787615999@theinstitutenc.org
SUMMARY:BUFFALO ROAD PARALLEL 20” Valve Insertion
DESCRIPTION:20” Valve Insertion on US 70 Business
URL:https://theinstitutenc.org/event/buffalo-road-parallel-20-valve-insertion/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260825
DTEND;VALUE=DATE:20260826
DTSTAMP:20260816T231611
CREATED:20260812T195155Z
LAST-MODIFIED:20260812T195155Z
UID:10000578-1787616000-1787702399@theinstitutenc.org
SUMMARY:Industrial Park Pump Station Replacement
DESCRIPTION:Installation of a new 900 GPM duplex self-priming centrifungal pump station and associated valves and piping.
URL:https://theinstitutenc.org/event/industrial-park-pump-station-replacement/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260826
DTEND;VALUE=DATE:20260827
DTSTAMP:20260816T231611
CREATED:20260811T200616Z
LAST-MODIFIED:20260811T200616Z
UID:10000576-1787702400-1787788799@theinstitutenc.org
SUMMARY:Swain County Middle School - Bid Package 3100 Sitework
DESCRIPTION:Buchanan and Sons Inc is requesting quotes from Contractors and Suppliers for the Swain County Middle School Project – Bid Package 3100 Sitework located in Bryson City\, NC.     Subcontract items include but are not limited to Surveying\, Hauling\, Erosion Control\, Aggregate Base Course\, Asphalt Paving\, Concrete Curbs & Sidewalks\, Pavement Markings\, Fences & Gates (Temporary and Permanent)\, Retaining Walls\, Turfs & Grasses\, MIsc. Materials\, Misc. Appurtenances. \nDBE/MBE/WBE/HUB SUBCONTRACTORS AND SUPPLIERS ARE STRONGLY ENCOURAGED TO PARTICIPATE. \nALL QUOTATIONS WILL NOW BE OPENLY ACCEPTED UNTIL 12:00PM WEDNESDAY\, AUGUST 26th\, 2026. \nPROJECT IS SCHEDULED TO BID THURSDAY\, AUGUST 27th\, 2026 at 3:00pm. \nAll questions or comments for this project can be directed to:\n     Mr. Tom Edge (Estimator) or Mrs. Jessica Lewis (Office Administrator) by phone at (828) 497-9720\, fax at (828) 497-9721\, or by email at estimator@bsi-construction.com.
URL:https://theinstitutenc.org/event/swain-county-middle-school-bid-package-3100-sitework/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260909
DTEND;VALUE=DATE:20260910
DTSTAMP:20260816T231611
CREATED:20260811T174425Z
LAST-MODIFIED:20260811T174425Z
UID:10000575-1788912000-1788998399@theinstitutenc.org
SUMMARY:Maggie Valley Levee at Wastewater Treatment Plant and Moody Farm Rd & Travis Lane Streambank Repairs
DESCRIPTION:The project will consist of repair of damages from DR-4827-NC (TS Helene). Repairs for the Levee at WWTP will include replacement of rip-rap\, boulder streambank-toe protection along Leatherwood Creek\, installation of a single arm boulder vane\, replacement of backflow prevention structures to Jonathan Creek. Repairs for the Travis Ln and Moody Farm Rd projects will take place at two locations and will include installation of streambank boulder toe\, geolifts\, and single arm boulder vanes.
URL:https://theinstitutenc.org/event/maggie-valley-levee-at-wastewater-treatment-plant-and-moody-farm-rd-travis-lane-streambank-repairs/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR