BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theinstitutenc.org - ECPv6.14.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://theinstitutenc.org
X-WR-CALDESC:Events for theinstitutenc.org
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251211
DTEND;VALUE=DATE:20251212
DTSTAMP:20260429T205550
CREATED:20251113T183942Z
LAST-MODIFIED:20251113T184817Z
UID:10000425-1765411200-1765497599@theinstitutenc.org
SUMMARY:Town of Mayodan – WWTP Influent Pump Station
DESCRIPTION:Jimmy R. Lynch & Sons\, Inc. An Equal Employment Opportunity Contractor\, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race\, Color\, Religion\, Sex\, or National Origin and is Soliciting Bids for M/WBE Participation.\nWe would appreciate a quotation from your firm for any and all work and/or materials on the following project:\nProject Name: Town of Mayodan – WWTP Influent Pump Station Rehabilitation\n \nBid Date: Tuesday\, December 11th\, 2025 @ 2:00 PM\n \nPlease provide your proposal by: 12-10-25 @ 5:00 PM\n \nThis project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.\nWe are soliciting subcontract bids for the following trades. Work may include\, but not limited to: wastewater treatment plant\, submersible non-clog sewage pump\, magnetic flow meters\, electrical\, concrete work\, gravel\, hauling\, turf\, temporary bypass pumping\, temporary environmental controls\, seeding and restoration\, erosion control\, demolition\, coating and painting\, quality control\, material testing\, influent pump control panel\, rock excavation or blasting and removal\, videotaping\, material testing\, temporary utilities\, dewatering\, compaction of trenches\, and backfill along with any incidentals and materials necessary for construction to complete the project.\nThe work performed under this Contract shall include but may not be limited to the furnishing of all labor\, materials\, equipment and services\, whether specifically mentioned or not\, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.\n \nPlease contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions about the project or submitting a proposal.\n \nThe following link will provide you with the digital Plans and Specs:\nhttps://www.dropbox.com/scl/fo/7yuaylgxprw5oamfpdwbz/AEb6M4C36RvVvhgFDjdvdEg?rlkey=uht1q0b5sfm35ulqi6m0hx3be&st=eexyf86u&dl=0\n \nYou may view plans & specs at the following location:  JRL Office @ 314 S. Academy St. Pilot Mtn\, NC. \n \n\nAlso\, plans\, specifications and contract documents may be examined at: The Issuing Office of LKC Engineering\, PLLC\, Monday – Friday at 140 Aqua Shed Court\, Aberdeen\, NC 28315 between the hours of 9:00am and 4:00pm.\n\nJRL is willing to review any responsible quote and will negotiate terms\, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below\, if you have not heard from JRL by 12-18-2025 and I will inform you of the status of your bid.   If you need assistance with equipment\, obtaining bonding\, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification\, (if you are not certified.) loan capital\, lines of credit\, insurance or joint pay agreements\, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. \n \nBonding:  It is Jimmy R. Lynch & Sons\, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons\, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons\, Inc Performance & Payment Bonds to the Owner.\n \nIf you would like to obtain a bond on this project to help build your bonding capacity\, please let us know through email\, phone call or specifying on your quote and we will put you in contact with our Bonding Agent. \n \nFinancial Assistance:  Jimmy R. Lynch & Sons\, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.\n \n Quick Payments:  It is Jimmy R. Lynch & Sons\, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons\, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.\nJRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  \nPlease Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047   Fax: 336-368-4613
URL:https://theinstitutenc.org/event/town-of-mayodan-wwtp-influent-pump-station/
CATEGORIES:Bid Opportunities
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251211
DTEND;VALUE=DATE:20251212
DTSTAMP:20260429T205550
CREATED:20251204T143344Z
LAST-MODIFIED:20251204T143344Z
UID:10000430-1765411200-1765497599@theinstitutenc.org
SUMMARY:Mooresville\, NC / PARKERTOWN ELEMENTARY SCHOOL EARLY PROCUREMENT
DESCRIPTION:BELL CONSTRUCTION CO.\, INC.\nGENERAL CONTRACTORS PHONE: 704-873-6378\nPO BOX 1102 • 2472 NORTHSIDE DRIVE FAX: 704-873-1691\nSTATESVILLE\, NC 28687 • 28625 \nWednesday\, November 26\, 2025\nTo Whom It May Concern\,\nBell Construction Co.\, Inc. is seeking competitive sub-contract bids from qualified sub-contractors for the PARKERTOWN ELEMENTARY SCHOOL EARLY PROCUREMENT PACKAGES. Project location; Mooresville\, NC\nThis project bids Thursday\, December 11th\, 2025 at 2:00 p.m. est. Sub-bids are due for review to Bell Construction Co.\, Inc. on Thursday\, December 11th\, 2025 no later than 10:00 a.m. est. Interested subcontractors must be certified HUB\, MBE\, WBE\, DBE\, etc. certified. Contract documents are available for review upon request and/or can be shipped to interested sub-contractors. Trades include\, but may not be limited to: Temporary construction fencing\, asphalt paving package\, and construction of potable water well.\nInterested and qualified businesses should contact: Thomas Setser\, estimator\, for Bell Construction Co.\, Inc. Contact Thomas by phone at (704) 873-6378\, fax at (704) 873-1691\, or e-mail at thomas@bellconstruction-nc.com. Bell Construction Co.\, Inc. is an Equal Opportunity Employer. Assistance with bonding is and insurance is available upon request. Quick pay options are available for qualified trades.\nPlease follow up this email with a conformation email\, phone call\, or fax.\nThank you.\nBest Regards\,\nThomas Setser\nEstimator\nBell Construction Co.\, Inc.\n2472 Northside Drive\nStatesville\, NC 28625\nMobile: 704-500-7574 Office: 704-873-6378 Fax: 704-873-169
URL:https://theinstitutenc.org/event/mooresville-nc-parkertown-elementary-school-early-procurement/
CATEGORIES:Bid Opportunities
END:VEVENT
END:VCALENDAR