Deadmon Road Booster Pump Station Replacement

February 19
Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for any and all work and/or materials on the following project:
Project Name: Deadmon Road Booster Pump Station Replacement
 
Bid Date:  Thursday, February 19th, 2026 @10AM
 
Please provide your proposal by:  Wednesday, February 18th, 2026
 
This project consists of constructing of the Construction of the new Deadmon Road Booster Pump station building to include two (2) fifty (50) horsepower (HP) horizontal split-case centrifugal pumps operated in dutystandby configuration, electrical work including variable-frequency drives (VFDs), associated piping, HVAC, SCADA, valves, & appurtenances. The suction & discharge lines will connect to the existing 12-inch water main along Turrentine Church Road. • Five (5) motorized actuated butterfly valves (BFVs) controlled by SCADA that determine the direction of flow through the station (to the north or to the south). • Demolition of the existing booster pump station. • See the Drawings for full details on the scope of the Work.
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: pump station, piping, electrical work, SCADA, testing, grading & landscape, paving & surfacing, lighting, electrical resistance air coils, painting, steel doors & frames, joint fillers, sealants & caulking, structural insulated panels, gratings, checkered floor plates & access doors, PVC waterstops, HVAC, demolition, valves, structural concrete, concrete formwork, grout, galvanizing, metal fastening & materials, structural steel, along with any incidentals & materials necessary for construction to complete the project.
The work performed under this Contract shall include but may not be limited to the furnishing of all labor, materials, equipment & services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina & all pertinent administrative regulations shall apply to this project as if herein written out in full.
 
Please contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions about the project or submitting a proposal.
 
The following link will provide you with the digital Plans and Specs:
 
https://www.dropbox.com/scl/fo/j4k27aulg81a3nwj942y7/ACN28YcGHy3dZv8Qh34zjbU?rlkey=3izoguq337p50qhab04903yhy&st=aan2wid9&dl=0
 
You may view plans & specs at the following location:  JRL Office @ 314 S. Academy St. Pilot Mtn, NC. 
 
JRL is willing to review any responsible quote and will negotiate terms, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 2-27-2026 and I will inform you of the status of your bid.   If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. 
 
Bonding:  It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
 
If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will put you in contact with our Bonding Agent. 
 
Financial Assistance:  Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
 
 Quick Payments:  It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.
JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047   Fax: 336-368-4613