Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for all work and/or materials on the following project:
Project Name: Lewisville – Lift Station Upgrades, FB2633
Bid Date: Thursday, September 9th, 2025
Please provide your proposal by: 09-08-25 @ 5:00 PM
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: lift station upgrades, sewer, water, pipe work, seeding, mulching, double seal asphalt surface treatment, HMAC parking lot replacement, hauling, stone, clearing and grubbing, erosion and sediment control, traffic control, demolition of existing lift station, surveying and staking, aggregate base course, stone, mulching, excavation, fence gates, chain link fencing, stabilization stone, mobilization and demobilization
along with any incidentals and materials necessary for construction to complete the project.
The Project includes the following Work:
1. 4,520 LF 8” C900 PVC Force Main
2. 4,850 LF 8” SDR-26 PVC Sanitary Sewer
3. 500-GPM Submersible Duplex Lift Station and Associated Site Improvements
4. 3,300 LF 20-ft Wide ABC Access Driveway with 12-ft Double Seal AST
5. All other appurtenances, electric and water service utilities, electrical and
instrumentation for a complete and
The work performed under this Contract shall include but may not be limited to: The furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.
The following link will provide you with digital Plans and Specs
or
The most current edition of The City of Winston-Salem Technical Specifications and Detail Drawings for Water Line and Sanitary Sewer Line Construction will govern all water and sanitary sewer construction. The City’s files can be viewed online at:
https://www.cityofws.org/596/Publications
You may view plans & specs at the following locations: JRL Office @ 314 S. Academy St. Pilot Mtn, NC.
Contract documents, including Drawings and Technical Specifications, are on file and may be reviewed at the following locations: JRL Office @ 314 S. Academy St. Pilot Mtn, NC 27041
JRL is willing to review any responsible quote and will negotiate terms, if appropriate. We will notify your firm if your bid is accepted for this project. Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 9-16-2025 and I will inform you of the status of your bid.
If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance.
No M/WBE firms were rejected due to lack of qualifications. No negotiations were needed. All M/WBE subcontractors’ quotes are considered, and none were rejected without sound reason.
Bonding: It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will get you in contact with our Bonding Agent.
Financial Assistance: Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
Quick Payments: It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.
JRL encourages 2nd tier M/WBE Subcontracting opportunities. We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047 Fax: 336-368-4613