Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for all work and/or materials for the following project:
Project Name: Taxiway K Rehabilitation – Bid Package 1
Bid Date: Thursday, April 7th, 2026 @ 10:00 AM
Please provide your proposal by: 4-6-26 @ 5:00 PM
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: airfield pavements, erosion control, hauling, asphalt, construction of new airfield concrete pavement on taxiways, install storm drainage systems, seeding, mulching, earthwork, mobilization, silt fence & outlet, pavement removal, aggregate base removal, storm drainage removal, corrugated metal pipe removal, miscellaneous demolition, subbase course, muck excavation, unclassified excavation, culvert inlet & outlet protection, rock check dam, mobile lighted closed runway marker, temporary swale crossing, rigid inlet protection, lime, lime treated subgrade, crushed aggregate base course & NCDOT ABC, cement treated base course (reclaimed and contractor sourced), cement, reinforced concrete pipe, manholes, drop inlet, square box drop inlet, underdrain cleanout, reflective permanent marking, mulching, temporary airfield lighting, miscellaneous demo, pavement sensor cable, PVC conduit, directional bore, handhold (aircraft rated), airfield electrical, taxiway edge retroreflective marker & light, base can, led signs, relocation of existing FAA communication cables, along with any incidentals & materials necessary for construction to complete the project.
This project consists of demolition of existing airfield pavements, earthwork, erosion control items, installation and reconfiguration of storm drainage systems, construction of new airfield concrete pavement on taxiways and asphalt pavement on shoulders and service roads, airfield electrical, markings, seeding, mulching, and other incidental items necessary to complete the project. Work is expected to begin in Summer of 2026 and continue through Summer of 2027.
The work performed under this Contract shall include but may not be limited to: The furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina & all pertinent administrative regulations shall apply to this project as if herein written out in full.
The following Dropbox link will provide you with the digital Specs & Plans
https://www.dropbox.com/scl/fo/ch2glgcarcnjqdb4w6xy1/AKv4zjCzGfVHPfsD6SZPTFw?rlkey=n69yf207o0vjlu5ccpojsb97g&st=8qm0x9ik&dl=0
You may view plans & specs at the following locations: JRL Office @ 314 S. Academy St. Pilot Mtn, NC. Also, Bidding Documents also may be examined
online at the owners website at flyfrompti.com and all work will be in accordance with the Plans and Specifications.
JRL is willing to review any responsible quote & will negotiate terms, if appropriate. We will notify your firm if your bid is accepted for this project. Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 4-14-2026 & I will inform you of the status of your bid. If you need assistance with equipment, obtaining bonding (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us & we will review your needs and direct you to available agencies for assistance.
Bonding: It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will get you in contact with our Bonding Agent.
Financial Assistance: Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
Quick Payments: It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.
JRL encourages 2nd tier M/WBE Subcontracting opportunities. We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047 Fax: 336-368-4613