Ashe Plantation Lift Station

November 11 @ 8:00 am - November 12 @ 2:00 pm

The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch force main. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

We are requesting quotations for the following trades/disciplines:
SELECTIVE DEMOLITION
CONCRETE
DOORS & HARDWARE
HAULING
SITEWORK
CONCRETE BUILDING
CLEARING & GRUBBING
FENCING
PAINTING
EROSION CONTROL
GRASSING & SEEDING
ELECTRICAL
ASPHALT & GRAVEL PAVING
HVAC