Loading Events

« All Events

  • This event has passed.

Dallas, NC / Dallas High Shoals Water Interconnect

August 28

STATE UTILITY CONTRACTORS, INC.
P.O. BOX 5019 – MONROE, N.C. 28111-5019 | (704) 289-6400 | FAX (704) 282-0590
Water and Wastewater Treatment Plant Construction Division
REQUEST FOR SUBCONTRACT BIDS
Project: Dallas High Shoals Water Interconnect, Contract 3 – Pump Station
Location: Dallas, NC
Gaston County
Engineer: HDR Engineering Inc. Contractor: State Utility Contractors, Inc.
555 Fayetteville Street, Suite 900 Estimator: Bill Williams
Raleigh, NC 27601 Email: PlantEstimating@sucontractors.com
Bid Date: August 28, 2025 @ 2:00 PM Scope Due by: August 27, 2025 @ 5:00 PM

Bid Document: Sub Bid Request – Dallas High Shoals PS

Details

Date:
August 28
Event Category: