Loading Events

« All Events

Boonville Improvements for Better WWTP Effluent

February 19

Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.

We would appreciate a quotation from your firm for any and all work and/or materials on the following project:

Project Name: Boonville Improvements for Better WWTP Effluent

Bid Date: Thursday, February 19, 2026 @ 2:00 PM

Please provide your proposal by: 2-18-26 @ 5:00 PM

We are soliciting subcontract bids for the following trades. Work may include, but not limited to: Pipe Work / Pipe Fittings, Valves & Specialties, Sanitary Sewer, Electrical, Pump Station, Hauling, Erosion Control / Erosion Siltation & Pollution, Concrete Paving, Concrete Work, Cast-in-Place Concrete, Stone, Earthwork/Earth Moving, Clearing & Grubbing/Stripping, Concrete Protective Coatings / Coatings, Paintings, Demolition, Geo-Textile, Quality Control, PEMB / Pre-Engineered Gable Symmetrical Metal Building, Excavation/Clearing & Grading, Dewatering, Subgrade Preparation for Roads, Bored Encasement Installation, Flow Control, Major Equipment Items – Stay-in-Place PVC Formwork – Digester & Equalization Basins, Disc Filter Equipment, Submersible Sewage Pumps, Hybrid Blower Systems along with any incidentals and materials necessary for construction to complete the project.

The Scope of Work to be performed under these Contract Documents is generally described as follows: Includes demolition of the old Parshall Flume that is going to be replaced with a Magnetic Flow Meter. Addition of a new Equalization Basin and Digester, New Tertiary Filters, four (4) Pump Stations. A New PEMB with HVAC, dewatering dumpster(s), UV system relocation, and all other work as shown on the construction drawings. All piping, electrical components, brackets, braces and appurtenances are to be included in the original scope of work so that the final product is functional and permittable according to the issued ATC for this work.

The work performed under this Contract shall include but may not be limited to the furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.

Please contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions on the job link below.  

The following link will provide you with the digital Plans and Specs:

https://www.dropbox.com/scl/fo/e7dpi35596maa4j3zltuz/ABsNOOqChHe12dNiMkl2oE8?rlkey=4k9wvhnw15di9ku26jkl10rj1&st=re2bdvvy&dl=0

You may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn, NC, 27041. Bidding Documents may also be examined at the following location and All work will be in accordance with the Plans and Specifications which may only be obtained at the office of:

Contract Documents can be downloaded for free from the TRC Companies Online Planroom

https://www.trccompanies.com/knowledge/trc-construction-planroom

The Contract Documents may be examined at the following location(s):

Owner – Town of Boonville, 110 Carolina Ave North, Boonville, NC 27011

Issuing Engineer Office – TRC 114 Edinburgh South Drive, Suite 200, Cary, NC 27511 (919) 827-0864

JRL is willing to review any responsible quote and will negotiate terms, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 2-26-2026 and I will inform you of the status of your bid.   If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. 

Bonding:  It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.

If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will put you in contact with our Bonding Agent. 

Financial Assistance:  Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop Joint Check Agreement to satisfy all parties.

Quick Payments:  It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.

JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  

Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047   Fax: 336-368-4613

Details

Date:
February 19
Event Category: