Maggie Valley Levee at Wastewater Treatment Plant and Moody Farm Rd & Travis Lane Streambank Repairs
September 9
The project will consist of repair of damages from DR-4827-NC (TS Helene). Repairs for the Levee at WWTP will include replacement of rip-rap, boulder streambank-toe protection along Leatherwood Creek, installation of a single arm boulder vane, replacement of backflow prevention structures to Jonathan Creek. Repairs for the Travis Ln and Moody Farm Rd projects will take place at two locations and will include installation of streambank boulder toe, geolifts, and single arm boulder vanes.

