- This event has passed.
DreamBuilt Construction/ Union Station 2nd Floor Interior Upfit – 300 S. MLK Jr. Blvd, Winston Salem, NC 27101
March 21, 2023
DreamBuilt Construction is soliciting quotes from vendors and licensed subcontractors, including HUB Certified vendors and subcontractors, for the following project:
Union Station 2nd Floor Interior Upfit – 300 S. MLK Jr. Blvd, Winston Salem, NC 27101
Description of Project:
The scope of work on this project involves a build out the 2nd floor shell space into a 11,832SF finished office environment. The building is a former train station and on the National Register of Historic Places.
Prospective bidders should read carefully the entire bidding documents prior to placing a bid.
Trades available include the following:
-Demolition
-Rough Carpentry
-Architectural Woodwork
-Firestopping
-Wood Doors
-Overhead Coiling Grilles
-Door Hardware
-Glazing
– Metal Framing
-Gypsum Board
-Interior Painting
-Staining and Transparent Finishing
Minority and Women Business Enterprise goals apply: 10% MBE 10% WBE
Approximate start date will be mid-June 2023. Project duration is ~150 calendar days.
Bids are due in our office by 5 pm on March 21, 2023. No exceptions can be made.
Plans/specifications are available at the following locations:
*Offices of DreamBuilt Construction, 5120 US Highway 158, Advance, NC 27006;
*City of Winston Salem Purchasing, 101 N. Main Street, City Hall Room 334, Winston Salem,
NC 27101, (336) 747.6936;
*Owen Architecture, Kevin Owen, [email protected], 336-761-8246
We are also able to meet to allow review of plans upon request.
Plans/specs are also available via the attached link.
https://drive.google.com/drive/folders/1ptRpRePJy4I_z0rJY_RWZNCkhXl9NOlI?usp=share_link