MWBE Bid Opportunity: E.M. Johnson Water Treatment Plant Generator Improvements – Phase 2 Project
The Project consists generally of the following major items:
- Construct a new Power Generation Facility, including the following major components:
- 5kV Generator Paralleling Switchgear, and associated generator controls
- 5kV Plant Distribution Switchgear as associated controls
- Low voltage distribution equipment for the building and surrounding areas
- Two (2) standby diesel generator systems with provisions for two (2) future generators (complete with all associated and ancillary components)
- Appropriate fuel system piping, heating, ventilation, and air conditioning, windows, doors, and structural members as outlined in the Contract Documents.
- Construct a new Fuel Storage Facility, including the following major components:
- One (1) Bulk Diesel Storage Tank, including all associated piping
- Structural support and concrete containment area for one (1) diesel tank and one (1) future diesel tank
- A canopy to cover the entire diesel containment area, including a cantilevered portion to cover the Diesel Truck during the fueling process
- Construct new and modify existing in-plant roadways to accommodate the Power Generation and Fuel Storage Facilities
- Resurface or replace sections of existing asphalt pavement throughout the site, including areas not directly associated with the new facilities in this project. These items and areas are further defined on the Contract Drawings
- Install new bioretention cell and associated grading
- Integration of proposed upgrades and facilities into the existing SCADA, Security, and Fire Alarm systems at the plant
Some possible needed MWBE subcontracting trades include:
- General Civil Contractor
- Electrical Contractor
- HVAC/Mechanical Contractor
- Plumbing Contractor
- Masonry Contractor
- Painting Contractor
- Roofing Contractor
- Security System Installation Contractor
- Earthwork/Site Grading/Excavation Contractor
- Landscaping Contractor
- Erosion Control/Silt Fence Installation
- Water/Sewer/Storm Drain Pipeline Contractor
- Concrete Forming and Placing
- Waterproofing
- Rebar Tying
- Asphalt Paving
- Concrete Curb & Gutter, Sidewalks
- Trucking/Hauling
A Mandatory Pre-Bid Meeting will be held at 2:00 PM, Tuesday, May 2, 2023 at the E.M. Johnson WTP Training Facility, 10301 Fall of Neuse Road, Raleigh, NC 27614. A picture I.D. is required for entry into the water plant facility, and all attendees must RSVP by submitting an email with the names of planned attendees to the following email address: [email protected].
Attendance by all bidders is mandatory. Proposals will not be accepted by the Owner from bidders that are not present at the Mandatory Pre-Bid meeting. If the Bidder would like to make additional visits to the site beyond the mandatory Pre-Bid Meeting, advanced notice must be provided and a list of planned attendees must be submitted with the request.
Sealed Bids will be received until 2:00 pm, Thursday, May 18, 2023, at One Exchange Plaza, 6th Floor Conference Room 1, Raleigh, NC, 27601, at which time and place bids will be publicly opened and read aloud for the construction of the E.M. Johnson Water Treatment Plant Generator Improvements – Phase 2 Project.
Click below to view a detailed overview regarding this advertisement:
E.M. Johnson Water Treatment Plant Generator Improvements – Phase 2 Project
All questions concerning this project should be directed to:
Perry Allen
[email protected] |