Loading Events

« All Events

  • This event has passed.

Cape Fear Public Utility Authority/ ER/EID and FONSI Documents – New 48” Raw Water Transmission Main Project

June 6, 2023

Cape Fear Public Utility Authority (CFPUA) desires to contract with a professional engineering firm to assist with the development of the ER/EID and FONSI documents for the new 48” Raw Water Transmission Main Project.  Lower Cape Fear Water and Sewer Authority (LCFWASA), Brunswick County, Pender County, and CFPUA have an Interlocal Agreement to fund the new 48” Parallel Raw Water Transmission Main project.  LCFWASA received $23.5 million from American Rescue Plan Act (ARPA) and CFPUA received State loan from Drinking Water State Revolving Fund (DWSRF) to assist with funding the new parallel raw water line.  The anticipated overall project budget is $35.2 million.

Firms are invited to submit a Statement of Qualification to the CFPUA to be received no later than 2:00 PM on June 6, 2023.

48 Raw Water RFQ

Details

Date:
June 6, 2023
Event Category: