- This event has passed.
Tri-State Utilities/ Town of Walstonburg I & I Remediation Phase III
June 5, 2023
Tri-State Utilities, LLC (TSU) is seeking qualified North Carolina Historically Underutilized Businesses (HUB) consisting of minority, women and disabled business firms
to provide pricing for a project in Walstonburg, North Carolina.
The project is entitled Town of Walstonburg I & I Remediation Phase III.
Bids due 06/05/2023 to TSU for submission to the owner on 06/06/2023.
Project Description/subcontracting opportunities:
Gravity sewer system repairs – 1,336 LF of 10” CIPP repair, along with several point repairs consisting of short gravity sewer pipe replacements,
service reconnections, and associated asphalt surface repairs, bypass pumping, traffic control, flagging, etc.
Bid documents may be acquired by contacting the 27888; Issuing Engineer Office – Draper Aden Associates 114 Edinburgh South Drive, Suite 200, Cary, NC 27511, (919) 827-0864.
Contract Documents can be downloaded for free from the Draper Aden Associates Online Planroom (www.DAA.com)
Bid Documents can also be attained via email by contacting Craig Welsh with Tri-State Utilities, LLC at [email protected] or calling him at 757-800-1592.
Tri-State is willing to review any responsible quote and will negotiate terms, if appropriate.
Tri-State may be able to break down the project into manageable sizes, arrange for quick-pay agreements, arrange for joint pay agreements,
or to negotiate for same unit pricing for the subcontractor that is available to Tri-State.