- This event has passed.
State Utility Contractors/Southeast Sewer Catawba Creek Outfall Part 2
June 6, 2023 @ 10:30 am
REQUEST FOR SUBCONTRACT BIDS
Project: |
Southeast Sewer Catawba Creek Outfall Part 2 (Contract 5B)
|
Location: |
Gastonia, NC
|
Engineer: |
LaBella Associates, P.C. |
Contractor: |
State Utility Contractors, Inc. |
400 S. Tryon Street, Suite 1300 | Estimator: | Mead Creasy | |
Charlotte, NC 28285
Phone: 704-376-6423 |
Email: | [email protected]
|
|
Bid Date: | June 6, 2023 at 10:30 a.m. | Scope Due by: | June 5, 2023 at 5:00 p.m. |
We are requesting quotations for the following trades/disciplines:
EROSION CONTROL | ROCK EXCAVATION | SURVEYING |
ASPHALT PAVING REPAIRS | PIPE AND MISC. SUPPLY | TRAFFIC CONTROL |
SEEDING & MULCHING | MANHOLE SUPPLY | |
MATERIAL HAULING | CLEARING | |
CONCRETE REPAIR | BORE AND JACK | |
FENCE REPAIR | STONE SUPPLY | |
Check the appropriate box below indicating whether or not you plan to submit a bid on this project and FAX or EMAIL it back to us within 48 hours of receipt.
Documents can be reviewed at the following location:
State Utility Contractors, Inc., Online Plan Room, http://planroom.sucontractors.com/ – Login ID: line |
iSqFt Plan Rooms in Columbia SC, Greenville SC, Charleston SC, Charlotte NC, Raleigh NC, and Online |
Dodge Plan Rooms in Columbia SC, Charleston SC, Charlotte NC, Atlanta GA, and Online |
Duncan Parnell, 900 S. McDowell St., Charlotte, NC 28204, Phone: 704-372-7766 (www.dpibidroom.com) |
Please mark your response below and FAX this sheet back, or reply to this sender by MAIL or by E-MAIL:
Will Bid | Company: | Phone: | ||||||
Will NOT Bid | Contact: | Fax: | ||||||
Trades/Discipline: | E-mail: | |||||||
Note:
- State Utility has established a quick pay agreement policy for this project to enable subcontractors and suppliers to meet cash flow demands.
- If your firm is interested in quoting any of the items above, or any work related to this type of construction, we request that you contact us the number shown above. Quantities and scope of work will be supplied, if available, upon request.
- State Utility is willing to break down or combine elements of work into economically feasible units on a case-by-case basis and will negotiate in good faith effort with any firm that is interested in doing so.
- State Utility is willing to facilitate a joint venture between MBE’s to help them to be able to bid the present project. Contact us if you need help with this matter. If the job is too big for you or you need help to quote a complete package.
- State Utility is willing to aid MBE’s in obtaining financial assistance for the project.
- State Utility is willing to assist MBE’s in getting their own bond or insurance for this city contract or others if needed.
- State Utility is willing to cover MBE’s under our insurance and bond. Contact us or make it evident on your quote that you need this included.