- This event has passed.
Mount Olive, NC/ Parallel Taxiway – Mount Olive Municipal Airport
March 14
The project shall consist of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the PARALLEL TAXIWAY. Items of work include sedimentation and erosion control, bituminous pavement milling and removal, grading, drainage system removal and installation, dewatering for subgrade installation, cement treated subgrade, crushed aggregate base course, bituminous surface course, marking, lighting removal and installation, sodding, seeding and mulching.
227 Mount Olive Airport Road, – Mount Olive, NC –
Bids are due by March 14, 2024 01:00 PM
We would appreciate your quote on any items or phase of work which Small Business Transportation Resource Center (South Atlantic Region) performs. The following work codes are applicable to this project: 000050 – Hauling (Gravel, Sand, Debris, Etc) 000200 – Clearing and Grubbing 001204 – Symbols Characters, Markers – Non Truck Long Lines 001605 – Temporary Silt Fence 001660 – Seeding and Mulching 001670 – Landscape Planting 016607 – Mowing 000060 – Asphalt/Concrete Saw Cutting 000310 – Pipe Installation 000501 – Chemical Soil Stablization 000520 – Aggregate Base Course 000710 – Concrete Pavement 000711 – Concrete Pavement Repair 000801 – Construction Surveying 001400 – Roadway Lighting 003130 – Ground Improvement Methods 008010 – Airfield Concrete Paving 008020 – Airfield Asphalt Paving 008100 – Airfield Markings The plans and specifications for Parallel Taxiway – Mount Olive Municipal Airport are available for viewing at my office or by following the link above. Please contact us for assistance in obtaining bonding, lines of credit, and insurance as required. Bonds are not required for Subcontracts less than $100,000.00. Also contact us for assistance in obtaining necessary equipment, supplies, materials, or related services. Quick pay is available for qualified scopes of work. S. T. Wooten encourages the use of DBE/MBE/WBE second and third tier subcontractors. Please list any used in your quotes.
Please mail or fax us your quote to our Wilson, North Carolina office at (252) 243-0900 or e-mail your quote to Please advise us of your interest in quoting the referenced projects at least one week before March 14, 2024 01:00 PM .
Thank you,
Rodney Cole