High Point, NC/ Primary Clarifier 1-5 Bridge Rehabilitation Project
High Point, NC - Primary Clarifier 1-5 Bridge Rehabilitation Project (25-010423) The existing bridges for the 5 primary clarifiers at the Eastside WWTP are in poor condition. The work consists of full blast surface preparation and coating application on the #1, #2, #3, #4, and #5 clarifier bridges and interior steel. For information regarding this…
AECOM/ Jordan Lake Water Reclamation and Reuse Project – Phase 2 RTP South
The new Bid Opening will be on Wednesday, January 4th, 2023, at 3:00 PM at the Wake County Justice Center, Room 2900, Raleigh, NC. Addendum No 1__12.07.2022_Jordan Lake Water Reclamation and Reuse Project Ph 2 RTP South Addendum No 2_12.14.2022_Jordan Lake Water Reclamation and Reuse Project Ph 2 RTP South
The BEE Group/ REBID – Charleston, SC – Stevens Barracks Window Replacement 2022
REBID - Charleston, SC - Stevens Barracks Window Replacement 2022 The building will remain completely functional and fully protected at all times during the construction work. All ingress/egress to facility and pedestrian walkways must be maintained with overhead protection when construction is occurring at/over these areas. Base Bid work includes the removal and replacement of…
T.A. Loving/ Jordan Lake Water Reclamation and Reuse – RTP South – Wake County NC
T. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the Jordan Lake Water Reclamation and Reuse – RTP South project for Wake County which bids January 4, 2023, at 3:00 PM. Plans and specifications for this project are available at the following locations: …
Charlotte, NC – Resurfacing FY 23-24
Charlotte, NC - Resurfacing FY 23-24 (HC2022-1178) This contract consists of street resurfacing and its associated functions throughout the city. Resurfacing is not limited geographically as the possibility exists for paving to be performed anywhere within the City. The project includes traffic control, asphalt and concrete pavement milling, asphalt paving, base failure repair, asphalt surface…
Charleston (SC) County School District/ North Charleston, SC – R.B. Stall High School – Chiller Plant Replacement
North Charleston, SC - R.B. Stall High School – Chiller Plant Replacement Scope of work includes, but is not limited to, provide three (3) new 400 Ton chillers, four (4) new primary pumps, and revised piping to and from the chillers and the building. The revised piping to and in the building shall account for…
T. A. Loving/ 105 Warlick Street CIPP Lining – Jacksonville NC
T. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the 105 Warlick Street CIPP Lining project for the City of Jacksonville which bids January 5, 2023, at 3:00 PM. Plans and specifications for this project are available at the following locations: TA Loving…
Raleigh-Durham Airport Authority/ Outreach Meeting
RDU Interational AirportThe Raleigh-Durham Airport Authority invites you to join us in-person on, Wednesday, January 5, 2023, at 9:00 am (EST) to hear about upcoming exciting opportunities. The Outreach Meeting will include comprehensive insights about the Raleigh-Durham International Airport and the following Passenger Services RFP Packages: Passenger Mail Service Flowers and Cordial Gift Vending Brochure Rack Reverse ATM…
WK Dickson/ Spartanburg (SC) Downtown Memorial Airport – Runway End 23 Erosion Repair
Spartanburg (SC) Downtown Memorial Airport - Runway End 23 Erosion Repair (20220770.00.CA) The work will consist of erosion repairs located on the 23-end of the Runway, removal and replacement of storm drainage pipe and structures, modifications to existing storm drainage inlets, gravel access road removal, regrading and relocation modifications to an existing detention area structure…
Brasfield & Gorrie/ Clemson (SC) DAC
All the upcoming project opportunities for Brasfield & Gorrie are below. All of these can be found on the EQUIP website as well. Log in HERE. If you are not a member of EQUIP yet, see this link to learn more: EQUIP - Brasfield & Gorrie (brasfieldgorrie.com) The office contact information is below, or you…
ST Wooten/ NCDOT C204695 – Craven Co US 70 Design Build
C204695 Craven Co US 70 Design Build Grading, Paving, Drainage, Utility, ITS, Signing, Traffic Control, and Structures work to bring US 70 between approximately Lewis Farm Road and Thurman Road up to interstate standard and add 3 grade separation interchanges at Stately Pines Rd, Fisher Ave, and Camp Kiro Rd. Bids are due by January…
Willis Engineers/ Laurinburg, NC – Crestline Pump Station Renovation
Laurinburg, NC - Crestline Pump Station Renovation The Project consists of a complete renovation of the Crestline Pump Station, including new pumps, valves, piping, wet well coating, electrical equipment, and site improvements. Estimate for construction $300,000 For information regarding this project please contact: Jim Stowe, PE Willis Engineers 10700 Sikes Place, Suite 115, Charlotte, NC…