JR Vannoy & Sons/ NCDOT – DK00363 – Ashe County – Grading, Drainage, Paving and Structure –Bridge #040015 over South Beaver Creek on SR-1147 (Nettle Knob Rd.)
Project: DK00363 Ashe County Grading, Drainage, Paving and Structure –Bridge #040015 over South Beaver Creek on SR-1147 (Nettle Knob Rd.) Bid Date : September 7, 2023 @ 2:00 PM—Sub Quotes due by September 6 @ 12:00 PM Contact: Gary Eisner [email protected] 1608 Hwy…
SGS Contracting/ WTCC – Therapeutic Massage Renovation
There is no pre-qualification for this project. Project: WTCC - Therapeutic Massage Renovation Bids Due – 9/6/2023 at 5pm Project Description – Tenant Up-Fit of existing first floor lease space (1,734 sf) into therapeutic massage therapy training/educational space. The suite will accommodate eight (8) massage bays, new hand wash station, reception, waiting area,…
Pipeline Utilities/ Howland Avenue Water Main Replacement – Cary, NC
Pipeline Utilities, Inc. (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the Howland Avenue Water Main Replacement project for the Town of Cary which bids September 6, 2023, at 2:00 PM. Plans and specifications for this project are available at the following locations: Pipeline Utilities, Inc.;…
Pipeline Utilities/ Industrial Park Water and Sewer Facilities – Louisburg, NC
Pipeline Utilities, Inc. (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the Industrial Park Water and Sewer Facilities project for the Town of Louisburg which bids September 6, 2023, at 2:00 PM. Plans and specifications for this project are available at the following locations: Pipeline Utilities,…
Moffat Pipe/ Clayton Arbors Lift Station Diversion Project – Clayton, NC
Moffat Pipe, Inc. will be bidding on Clayton Arbors Lift Station Diversion Project for The Town of Clayton. We encourage minority and women business enterprise contractors to participate in the process. Moffat Pipe, Inc. will consider the following options/actions if requested in the proposal: assistance in obtaining bonding or insurance; coordinate joint payment agreements;…
Robbins Architecture/ Construction of New Equipment Shelter – Archdale, NC
Proposals will be received by the City of Archdale until 4:00 PM, September 7, 2023 in electronic format to Zeb Holden at email: [email protected] or hard copies will be received until the same time by hand delivery to the Utility Payment/Customer Service desk on the first floor of City Hall at 307 Balfour Drive, Archdale,…
V&M/ St. George, SC – Water System Improvements: Contract 1A South Line Replacements and Upgrades
St. George, SC - Water System Improvements: Contract 1A South Line Replacements and Upgrades Construction of approximately 3,741 LF of 6-inch water lines, 571 LF of 2-inch water line, install approximately 276 automatic read water meters, install 7 new fire hydrants, remove and replace 26 existing fire hydrants and related appurtenances, located in the areas…
V&M/ St. George, SC – Water System Improvements: Contract 1B East Line Replacements and Upgrades
St. George, SC - Water System Improvements: Contract 1B East Line Replacements and Upgrades The Project consists of construction of approximately 9,734 LF of 6-inch water lines, install approximately 48 automatic read water meters, and related appurtenances, located in the areas of Ridge Street, West Murray Street, Raysor Street, East Raysor Street, Whitridge Lane, East…
V&M/ St. George, SC – Water System Improvements: Contract 1C West Line Replacements and Upgrades
St. George, SC - Water System Improvements: Contract 1C West Line Replacements and Upgrades Construction of approximately 8,440 LF of 6-inch water lines, 548 LF of 2-inch water line, install approximately 66 automatic read water meters, install 16 new fire hydrants, remove and replace 3 existing fire hydrants and related appurtenances, located in the areas…
Stantec/ REBID – Moncks Corner, SC – US52 / Foxbank Plantation Blvd Intersection Improvements
REBID - Moncks Corner, SC - US52 / Foxbank Plantation Blvd Intersection Improvements The work to be done consists of furnishing all materials, equipment and labor necessary to construct US52/Foxbank Plantation BLVD Intersection Improvements with a new traffic signal light. For information regarding this project please contact: Josh Lilly Project Architect Stantec 4969 Centre Pointe…
T.A. Loving/ Arbors Lift Station Diversion – Clayton, NC
T. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the Arbors Lift Station Diversion project for the Town of Clayton which bids September 7, 2023, at 2:00 PM. Plans and specifications for this project are available at the following locations: TA Loving Company,…
ST Wooten/ NCDOT – DC00435 – Duplin over Back Swamp – Grading, Drainage, Paving and Structures work to replace bridge 187 in Duplin Co, NC
DC00435 Duplin over Back Swamp Grading, Drainage, Paving and Structures work to replace bridge 187 in Duplin Co, NC. Cypress Creek Road - Wallace, NC 28466- Bids are due by September 7, 2023 02:00 PM The following work codes are applicable to this project: 000050 - Hauling (Gravel, Sand, Debris, Etc) 000200 - Clearing and…