Moffat Pipe/ McAdams Road Water Main Project – Hillsborough, NC
Moffat Pipe, Inc. will be bidding on the McAdams Road Water Main Project for The Town of Hillsborough. We encourage minority and women business enterprise contractors to participate in the process. Moffat Pipe, Inc. will consider the following options/actions if requested in the proposal: assistance in obtaining bonding or insurance; coordinate joint payment agreements;…
Moffat Pipe/ Morgan Creek Interceptor Project – Orange County Water & Sewer Authority (OWASA)
Moffat Pipe, Inc. will be bidding on the Morgan Creek Interceptor Project for The Orange County Water & Sewer Authority (OWASA). We encourage minority and women business enterprise contractors to participate in the process. Moffat Pipe, Inc. will consider the following options/actions if requested in the proposal: assistance in obtaining bonding or insurance; coordinate…
Sharpe Brothers/ Cedar Trail and Petree Road Sidewalk Improvements – Winston-Salem, NC
INVITATION TO BID City of Winston Salem Project Cedar Trail and Petree Road Sidewalk Improvements Dear Subcontractors: Sharpe Brothers is actively requesting quotations from Certified HUB Subcontractors from the North Carolina Department of Administration (HUB) or the NCDOT for the above project with a total project goal of 20% participation (12% MBE & 8% WBE). …
ST Wooten/ Wendell Blvd. Sidewalk Improvements
Wendell Blvd. Sidewalk Improvements EB-6048 consists of approximately 1,820 LF of sidewalk improvement along Wendell Blvd. (BUS 64). Project will include grading, drainage, paving, curb and gutter, traffic control, pavement markings and markers, utilities, erosion control, signing, and other related items as shown on the plans in accordance with these specifications and plans. All work…
Willis Engineers/ Lawndale, NC – Cleveland County Water, Contract 3.0 – Raw Water Weir – Phase 1
Lawndale, NC - Cleveland County Water, Contract 3.0 - Raw Water Weir - Phase 1 The Project consists of construction of one new low-head weir, including a moveable crest gate and boulder cascades. The Project will also include stabilization of the stream banks. For information regarding this project please contact: Laura Wallace, PE Willis Engineers…
High Point, NC/ Samet Drive Extension-Engineering Services
High Point, NC - Samet Drive Extension-Engineering Services Work under this contract consists of providing personnel, equipment and materials to develop the Samet Drive Extension; basically including, the installation of approximately 2,500 linear feet of various size reinforced concrete storm pipe, 1689 linear feet of 8” Ductile Iron Water Pipe, 175 linear feet of 8”…
Orange Water and Sewer Authority/ Morgan Creek Interceptor (276-59) Phase I Project
OWASA is requesting bids for the Morgan Creek Interceptor (276-59) Phase I Project. A complete copy of the advertisement is available at the Bid Opportunities link at: https://www.owasa.org/bid-opportunities/. All questions regarding this advertisement must be emailed to Andre Miller at [email protected]. Bids must be delivered to Andre Miller, P.E. , Utilities Engineer, at OWASA,…
NC Dept. of Adult Correction/ Franklin Correctional Air Conditioning Installation
Please find the following link for the Franklin Correctional Air Conditioning Installation project. Franklin Correctional Bid Documents Project Scope: The scope of this project is demolishing eight (8) heating and ventilating units in two (2) dormitory buildings and replace with new units, including air conditioning with external condensing units and supporting general, electrical, controls,…
Pipeline Utilities/ 2023 Water Main Replacement – Cary, NC
Pipeline Utilities, Inc. (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the 2023 Water Main Replacement project for the Town of Cary which bids January 23, 2024, at 2:00 PM. Plans and specifications for this project are available at the following locations: Pipeline Utilities, Inc.; 2204-F…
Raleigh, NC/ Millbrook Exchange Park Athletic Floor Project
Millbrook Exchange Park Athletic Floor Project The scope of work associated with this project is to remove existing gym floor and replace with a new floor at Millbrook Exchange Park. This includes all inspection/permitting fees. All work is to be performed in accordance with current North Carolina code. Some possible needed MWBE subcontracting trades include: General maintenance…
Raleigh-Durham Airport Authority/ Request for Quotes (RFQ): Ivanti Landesk Renewal
The Raleigh-Durham Airport Authority has released the attached Request for Quotes (RFQ): Ivanti Landesk Renewal. All offers are subject to the conditions identified and stated within. All written quotes will be received no later than 2:00 pm EST on Wednesday, January 24, 2024, at the following email address: [email protected]. Applicable requirements, forms, terms and conditions…
Raleigh-Durham Airport Authority/ Marketing Signs
Raleigh-Durham Airport Authority (the “Authority”) issues this request for written quotations (RFQ) for the products and/or services listed herein. All offers are subject to the conditions identified and stated within. All written quotes will be received no later than 2:00 pm EST on Wednesday, January 24, 2024 at the following email address: [email protected]. Applicable requirements,…