- This event has passed.
City of Wilson/ Wilson Ballpark Utilities Expansion
February 29
City of Wilson/ Wilson Ballpark Utilities Expansion
The Wilson Ballpark Utilities Expansion Project is for the replacement, relocation, and size increase of utilities to support future economic development initiatives located in downtown Wilson. To aid in development, the City of Wilson must upsize existing infrastructure and relocate to make way for potential development. Development in the area includes commercial and high density residential (multi-story apartments and hotels). This project spans multiple blocks along the roadways (city and state maintained) and some work within City owned parcels of land. The specific project components include, but are not limited to, replacing 6” various materials of sewer to 12” DIP and PVC, 6” various materials of water to 12” DIP and PVC, and upsizing from 30” RCP to 42” RCP stormwater pipes. There is approximately 2,300 LF of stormwater RCP to be installed, 1,850 LF of DIP sewer to be installed, 2,000 LF of DIP water to be installed, multiple boxes for stormwater, manholes for stormwater and sewer, and valves for water installation.
112 Goldsboro St. – Wilson, NC 27893-
Please advise us of your interest in quoting the referenced projects at least one week before February 29, 2024 02:00 PM.