- This event has passed.
City of Winston-Salem / Highway 65 Water Line Extension
July 30
Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for any and all work and/or materials on the following project:
Project Name: City of Winston-Salem – Highway 65 Water Line Extension
Bid Date: Thursday, July 30th, 2024 @ 2:00 PM
Please provide your proposal by: 07-29-24 @ 5:00 PM
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: Materials, Pipe Work, Water, Sewer, Erosion Control, Traffic Control Signs, Concrete Work, Video Surveillance, Surface Restoration, Base Course, Stone, Seeding, Mulching, Piping & Valves, Electrical, Hauling, Clearing & Grubbing, Precast Concrete, Site Grading, Landscaping, Streambank Restoration, Excavation, Rock Removal, Cleaning, Equipment, Fences, Quality Control, Topsoiling, Drainage, Shoring, Backfilling, Ductile Iron Fittings, Bore & Jack, Site Preparation along with any incidentals and materials necessary for construction to complete the project.
The Scope of Work to be performed under these Contract Documents is generally described as follows: Construction of approximately 13,420 LF of 8-inch ductile iron (DI) water line with fittings, valves, and other appurtenances, a pressure reducing station, up to 55 private service connections, 140 LF of 18-inch steel casing via bore and jack (two NCDOT road crossings, and one crossing of a retaining wall and driveway), 40 LF of 18-in steel casing via open cut (one NCDOT road crossing), one temporary stream crossing via pump-around, and groundwater dewatering as necessary for excavation. The project corridor spans between Rural Hall and Germanton along North Carolina Highway 65 in Forsyth County, North Carolina.
The work performed under this Contract shall include but may not be limited to the furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.
Please contact Daniel Lynch at [email protected] if you have any questions on the job link below.
The following link will provide you with the digital Plans and Specs:
You may view plans & specs at the following locations: JRL Office @ 314 S. Academy St. Pilot Mtn, NC. Also, Bidding Documents also may be examined at the following locations and All work will be in accordance with the Plans and Specifications which may only be obtained at Hazen and Sawyer, 620 Green Valley Rd, Suite 101, Greensboro, NC 27408 – (Issuing Office); WSFC Utilities, BAS Building Suite 257, 100 E. First Street, Winston-Salem, NC 27101. You may contact Darren Redfield at [email protected] (preferred), or at 336-747-6936.
JRL is willing to review any responsible quote and will negotiate terms, if appropriate. We will notify your firm if your bid is accepted for this project. Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 08-06-2024 and I will inform you of the status of your bid. If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance.
Bonding: It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will put you in contact with our Bonding Agent.
Financial Assistance: Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
Quick Payments: It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.
JRL encourages 2nd tier M/WBE Subcontracting opportunities. We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047 Fax: 336-368-4613
Thank you!