- This event has passed.
Dewberry/ Durham Public Schools – Neal Middle School Controls Replacement
March 20, 2023
Please find the following link for the Durham Public Schools – Neal Middle School Controls Replacement project:
DPS Neal Middle Controls Replacement
Project Scope:
The scope of this project is to replace existing system controllers, sensors, enclosures, and field devices. Existing actuators, frees tats, valves, and relays are intended to remain.
Any found not functional during checkout are to be captured on a deficiency report and replaced as needed. Project has Federal funding.
Anticipated Notice to Proceed date is on or before April 10th, 2023.
Work shall be substantially complete on or before August 31st, 2023. 143 calendar days.
Sealed bids will be received by Durham Public Schools up to 2:00pm on Monday, March 20th, 2023 and opened in person at 2011 Hamlin Road, Durham, NC 27704.
No emailed or faxed bids will be accepted.
Non-mandatory Pre-bid conference will be held on Tuesday, March 7th, 2023 at 10:00am on site at Neal Middle School, 201 Baptist Road, Durham, NC
Please meet at the front entrance of the school.
All design related questions should be directed to Dewberry Engineers, Inc. – Johnny Wood – [email protected] – (919) 215-2010.
The Durham Public Schools Representative is Kevin Coyne – [email protected]
Bid bond is required.
Performance and payment bonds are required.
2023.03.13 DPS RFP 179-2223-665 Neal Middle Controls Replacement – Addendum No 1