- This event has passed.
Dewberry/ JCPS Controls and HVAC Replacement – Package 4 Project
November 21, 2023
We would like to make you aware of the JCPS Controls and HVAC Replacement – Package 4 Project. Please see the following link to access the Bid Documents.
2023.10.22_JCPS Controls Replacement – Package 4 – Bid Documents
Project Scope of work is listed below:
Replacement of existing BAS Controls systems and Heating Hot Water and Chilled Water pumps at Polenta Elementary School, McGee’s Crossroads Elementary School, and Benson Elementary School.
Note:
PreBid Meeting Meeting will be held on Tuesday, October 31st @ 9am at Polenta Elementary School with walk through afterward.
Bid Opening Tuesday, November 21, 2023 @ 4:00pm, 2320 US 70 Business, Smithfield, NC 27577.