Hickory Construction/ MCLEANSVILLE REGIONAL READINESS CENTER

March 23, 2023

NOTICE TO ALL EQUAL EMPLOYMENT OPPORTUNITY HISTORICALLY UNDERUTILIZED BUSINESSES (HUB), I.E. MINORITIES, DISABLED PERSONS AND WOMEN OWNED AND OPERATED BUSINESSES, ETC.

 

***PLEASE NOTE THE FOLLOWING ADVERTISEMENT HAS BEEN UPDATED TO INCLUDE THE LATEST ADDENDUMS (1, 2 & 3) FOR THIS PROJECT***

 

PROJECT: MCLEANSVILLE REGIONAL READINESS CENTER, MCLEANSVILLE, NC 27301

BID INVITATION FOR:  McLeansville Regional Readiness Center, 4250 Camp Burton Road, McLeansville, NC 27301

Bid Date & Times: Submittal of Base Bid – Thursday, March 23, 2023 at 2:00p.m., LOCAL TIME

                              Submittal of Alternate Bids – Thursday, March 23 2023, at 3:30p.m., LOCAL TIME

                              Opening of Base Bid and Alternate Bids – Thursday, March 23, 2023 at 3:30p.m., LOCAL TIME

 

Bid Location: North Carolina National Guard (Joint Force Hdqtrs. JFHQ DFAC), 1613 Gold Star Drive, Raleigh, NC 27607 & 1636 Gold Star Drive, Raleigh, NC 27607 (Bid Opening – Cafeteria at Joint Force Headquarters) – Owner’s Representative: Robyn Bryant, Engineer III – Project Manager

All bids will be publicly opened and read aloud for the furnishing of labor, material & equipment on this date.

 

The work of project is defined by the Contract Documents and includes, but not limited to, the following scope: All labor, taxes, materials, equipment, services, permits, incidental and implied, to install a complete working system as designed. The project generally consists of the construction of an approximately 85,000sqft North Carolina National Guard Regional Readiness Center(RRC) in McLeansville, NC. The existing site has been cleared and the building pad graded to subgrade as part of a separate project. The building program consists of office and classroom space, an assembly hall, a kitchen, a physical fitness room, unit storage, and equipment locker rooms. The two-story northern portion of the building contains the offices, arranged in suites, on either side of a spacious lobby. The building is separated mixed use, requiring fire barrier walls between business, assembly and storage areas. The assembly space is a high bay, daylight-filled room with clerestory on three sides. On either side of the assembly hall are wings of storage and support spaces. The west wing houses the kitchen, large equipment locker room, fitness room and shower facilities. The east wing contains supply/storage areas, small equipment locker room, and a building maintenance area. The project includes all other work as shown, indicated or reasonably implied on the contract drawings and/or specifications for a complete project.

 

The featured scope of work per contract documents are as follows; Existing conditions, selective site demolition, cast-in-place concrete, CMU, cast stone masonry, structural steel framing, joists, decking, cold-formed metal framing, metal fabrications, metal stairs, metal railings, wood, plastics, and composites, thermal and moisture protection, openings, gypsum board, ACT, wood ceilings, resilient athletic flooring, terrazzo flooring, resinous flooring, tile carpet, sound absorbing wall units painting, special coatings, specialties, equipment, furnishings, special construction, hydraulic elevators, Fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities.

 

Hickory Construction Company, Hickory, NC is seeking subcontractors for specific scope of work as described above.

 

Please find a link (drop box) below that will allow you access to contract drawings, specifications, and addendum(s) for your use.

 

https://www.dropbox.com/scl/fo/j90optk7efemg67jjdc3n/h?dl=0&rlkey=4msx1zj5o8vyb2q58wfzr5ncw

 

Hickory Construction as the General Contractor is responsible for bidding the project.  Please direct all questions to the contact person provided below.

Contact for Hickory Construction Company is:  Mr. James Summers at estimating@hickory-construction.com

Phone:  828-381-4080