Loading Events

« All Events

  • This event has passed.

High Point (Guilford County) – Market District Infrastructure Improvements

March 4

Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for all work and/or materials on the following project:
Project Name: High Point (Guilford County) – Market District Infrastructure Improvements, Bid # 14-030425
Bid Date: Tuesday, March 4, 2025 @ 2:00 PM
 Please provide your proposal by: 02-03-25 @ 5:00 PM  
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: Pipe Work/Piping & Valves, Water, Sewer, Utilities, Electrical, Erosion Control, Traffic Control, Signage, Controllers w/ Cabinets, Signal Heads / Mast Arm & Signal Installation, Temporary Services, Concrete Work/Sidewalks & Driveways, Camera /Video Surveillance, Patterned Pavement, Grade Asphalt, Asphalt Concrete Surface, Milling Asphalt Pavement, Stone for Trench Stabilization and Pipe Bedding, Hauling, Curb & Gutter, Coatings, Geo-Textile, Fire Protection/Hydrants, Directional Drill, Blasting, Construction Surveying, Excavation, Pavement Marking (Thermoplastic & Paint), Duct Bank, Minor Structures /Minor Drainage Structures, Frame & Grate along with any incidentals and materials necessary for construction to complete the project.
This contract consists of providing personnel, equipment and materials to construct the Market District Infrastructure Project; approximately 4000 LF of water line, 3500 LF of sewer line, 2200 LF of duct bank, mast arm and signal installation, including approximately 4500 tons of various grade asphalt, 2200 square yards of 6” concrete sidewalk, 1000 square yards of 6” concrete driveway, 4500 linear feet of curb and gutter and other various items associated with the contract plans and specifications.
The work performed under this Contract shall include but may not be limited to: The furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.
 Please contact Daniel Lynch at dlynch@jrlynchandsons.com if you have any questions on the job link below.  
 The following link will provide you with digital Plans and Specs
 You may view plans & specs at the following locations:  JRL Office @ 314 S. Academy St. Pilot Mtn, NC.
 Contract documents, including Drawings and Technical Specifications, are on file and may be reviewed at the following locations:
 Duncan Parnell Company, Inc. 4275 Regency Drive, Suite 100 Greensboro, NC 27410 Office Phone Number: (336) 855-1211 Toll Free Number: (888) 688-7961 Fax Number: (336) 855-8868 https://bidroom.duncan-parnell.com/
 McGraw Hill/Dodge Plan Room 4300 Beltway Place Arlington, TX 76018
Hispanic Contractors Association / ConstructConnect.  The Rockwood Exchange 3825 Edwards Road, Suite 800 Cincinnati, OH 45209 www.constructconnect.com
 The Blue Book Building and Construction Network 800 E Main Street Jefferson Valley, NY 10535 888-720-1710 www.thebluebook.com
 JRL is willing to review any responsible quote and will negotiate terms, if appropriate.  We will notify your firm if your bid is accepted for this project.  Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 3-11-2025 and I will inform you of the status of your bid.   If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance. 
 Bonding:  It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
 If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will get you in contact with our Bonding Agent. 
 Financial Assistance:  Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
 Quick Payments:  It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the Owner.
Please contact me at dlynch@jrlynchandsons.com with any questions
 JRL encourages 2nd tier M/WBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.  
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047    Fax: 336-368-4613
Thanks Again, 
            Cathy Snow

         Corp. Secretary
336.368.4047

Jimmy R. Lynch & Sons, Inc.

Details

Date:
March 4
Event Category: