- This event has passed.
JR Lynch & Sons/ Winston-Salem – Activated Sludge Basins 3, 4, 5 and 6 Expansion Joint and Concrete Repairs at Archie Elledge Wastewater Treatment Plant
December 18, 2023
Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, NC General Contractors # 7706 Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for M/WBE Participation.
We would appreciate a quotation from your firm for any and all work and/or materials on the following project:
Project Name: Winston-Salem – Activated Sludge Basins 3, 4, 5 and 6 Expansion Joint and Concrete Repairs at Archie Elledge Wastewater Treatment Plant
Bid Date: Tuesday, December 19, 2023 @ 2:00 PM
Please provide your proposal by: 12-18-23 @ 5:00 PM
We are soliciting subcontract bids for the following trades. Work may include, but not limited to: Material, Pipe Work, Water, Sewer, Electrical, Concrete Work/ Repairs, Utilities, Thermal & Moisture Protection (Joint Fillers, Sealants & Caulking), Coatings, Painting, Demolition, Excavation, Gates, Quality Control, Basins, Contractor Access & Parking, Protection of Work and Property, Clean out of Mixing Tank, Patching along with any incidentals and materials necessary for construction to complete the project.
The Scope of Work to be performed under these Contract Documents is generally described as follows: Concrete spall repairs and expansion joint repairs for Activated Sludge Basins 3, 4, 5 & 6 as shown on Contract Drawings. Repair one (1) influent gate frame in Activated Sludge Basin No. 5. Removal and storage of existing guard rail along perimeter of Mixing Tank No. 1. Concrete spall repairs on Mixing Tank No. 1. Reinstalling guard rail along walking working surface and tank wall interface for Mixing Tank No. 1 as shown in Appendix B and cleaning and solids removal from Mixing Tank No. 1.
The work performed under this Contract shall include, but may not be limited to: the furnishing of all labor, materials, equipment and services, whether specifically mentioned or not, that is required to complete the Construction of the Work of the project. All requirements of the State of North Carolina and all pertinent administrative regulations shall apply to this project as if herein written out in full.
Please contact Daniel Lynch at [email protected] if you have any questions on the job link below.
The following link will provide you with the digital Plans and Specs:
https://drive.google.com/drive/folders/1gl6N4JpY1cP388pw5GcOnZW2FFoRoYn3
You may view plans & specs at the following locations: JRL Office @ 314 S. Academy St. Pilot Mtn, NC. Also, Bidding Documents also may be examined at the following locations and All work will be in accordance with the Plans and Specifications which are on file in the office of Hazen and Sawyer, P.C. 4011 West Chase Boulevard, Suite 300; Raleigh, North Carolina 27607
Contact Marcus Lanier via email at [email protected] (919) 833-7152)
JRL is willing to review any responsible quote and will negotiate terms, if appropriate. We will notify your firm if your bid is accepted for this project. Please contact Daniel Lynch @ number listed below, if you have not heard from JRL by 12-26-2023 and I will inform you of the status of your bid. If you need assistance with equipment, obtaining bonding, (J.R.L. will furnish bonds for all projects & will help you obtain the proper certification, (if you are not certified.) loan capital, lines of credit, insurance or joint pay agreements, please see JRL terms below or contact us and we will review your needs and direct you to available agencies for assistance.
Bonding: It is Jimmy R. Lynch & Sons, Inc. policy NOT to require M/WBE subcontractors to provide bonding to Jimmy R. Lynch & Sons, Inc. for their portion of the work. All M/WBE subcontractors will be allowed to work under Jimmy R. Lynch & Sons, Inc Performance & Payment Bonds to the Owner.
If you would like to obtain a bond on this project to help build your bonding capacity, please let us know through email, phone call or specifying on your quote and we will out you in contact with our Bonding Agent.
Financial Assistance: Jimmy R. Lynch & Sons, Inc. will provide Joint Check Agreements to all M/WBE subcontractors. Please request a Joint Check Agreement in writing. We will work with you and the material vendor to develop a Joint Check Agreement to satisfy all parties.
Quick Payments: It is Jimmy R. Lynch & Sons, Inc. policy to provide Quick Payments to all M/WBE subcontractors. Jimmy R Lynch & Sons, Inc will provide payment to all M/WBE subcontractors on a weekly basis if the work for which payment is being requested is complete and accepted by the City of Winston-Salem
Please contact me at [email protected] with any questions
JRL encourages 2nd tier M/WBE Subcontracting opportunities. We encourage our subcontractors to utilize 2nd and 3rd tier M/WBE Subcontractors.
Please Submit Quote the Day Prior to Bid Opening Phone: 336-368-4047 Fax: 336-368-4613
NCI MED Bidopps- W-S Activated Sludge Basins & Expansion Joint & Concrete Repairs