Loading Events

« All Events

  • This event has passed.

The Lane Construction Corporation/ VDOT I-81 Widening MM221-225 Design Build

February 15, 2023

PROJECT DESCRIPTION: The project consists of widening Interstate 81 to add one lane in each direction adjacent to the City of Staunton. The project has differing lengths NB and SB however, the overall project termini would be from MM 221.45 to MM 225.6 for a project length of 4.18 miles. Widening will occur primarily towards the median, though limited work to the outside will be necessary for shoulder strengthening (maintenance of traffic) and upgrading guardrail to current standards. Five bridges will be widened/rehabilitated with the project.

BID DATE: February 15, 2023

SUBCONTRACTING & MATERIAL SUPPLY OPPORTUNITIES INCLUDE, but are not limited to, the following: Clearing, Saw Cutting, Aggregates, Excavation, Blasting, Asphalt Paving, Flexible Pavement Milling, Trucking, Storm Drainage, Underdrain, Concrete Sitework, Seeding/Erosion Control, Landscaping, Sanitary Sewer, Water Line, Traffic Control Materials, Guardrail, Handrail, Ready-Mix Concrete, Structural Steel, Precast Concrete Girders, Reinforcing Steel Materials and Tying, Bridge Demolition, Traffic Signals, ITS, Steel Piling, Auger-Cast Piling, Pedestrian Fence, Bridge Railing, Striping, Signage, Retaining Walls, Drilled Shafts, Quality Control, as well as other opportunities and materials.

Lane Construction, as always, welcomes quotes from DBE/MBE/WBE and SBE subcontractors.

This project has a 6% DBE Requirement.

Quotes are due no later than close of business on Friday, January 30, 2023.

Please send quotes to Edna Perez at: [email protected] or via fax to (703) 225-7633.

Details

Date:
February 15, 2023
Event Category: