- This event has passed.
T2 Contracting/ CDBG-I Sewer Rehabilitation / Replacement – Dunn, NC
January 16
The City of Dunn is bidding this project on Wednesday, January 17, 2023, at 2:00 PM. This project consists of the rehabilitation of approximately 1,261 LF of 6-inch existing gravity sewer line, 6,494 LF of 8-inch existing gravity sewer line, 331 LF of 12-inch gravity sewer line, and approximately 37 manholes. The rehabilitation will include the replacement and reconnection of approximately 147 sewer connections and approximately 5,154 LF of 4-inch sewer laterals. If time and budget allow, the project may include up to thirteen (13) bid alternates in additional areas along Railroad Crossing (N. Fayetteville Ave. & Railroad), Utility Corridor (N Wilson Ave. & Railroad), E. Granville St (Moore St. & Clayton St.), E. Carr St. (N. Wilson Ave. & N. Clinton Ave.), Du Boise Cir (E. Townsend St. & Burke St.), N. Sampson Ave. (E. Broad St. & E. Edgerton St.), W. Barrington St. (N. Mackay St. & N. Layton St.), E. Harnett St. (N. Little Ave. & N. Sampson Ave.), E. Johnson St. (Burke St. & E. Granville St.), N. Washington Ave. (E. Harnett St. & E. Edgerton St.), N. Wilmington Ave. (E. Harnett St. & E. Edgerton St.), N. Sampson Ave. (E. Harnett St. & E. Edgerton St.), and W. Barrington St. (N. Layton Ave. & N. King Ave.).
T2Contracting Soliciting Letter – City of Dunn – CDBG Sewer Rehab 4th Round