Loading Events

« All Events

  • This event has passed.

Cullowhee, NC/ WCU Early Joyner Drive/Infrastructure Package

March 5

Cullowhee, NC/ WCU Early Joyner Drive/Infrastructure Package

Buchanan and Sons Inc is requesting quotes from Contractors and Suppliers for the WCU Early Joyner Drive/Infrastructure Package (SCO Project #22-24697-01B) located in Cullowhee (Jackson County), NC. Subcontract items and materials include but are not limited to the following:

Surveying

Hauling

Concrete

Electrical – Site Lighting

Erosion Control

Seeding & Mulching

Asphalt Paving

Pavement Marking & Signs

Chain Link Fence & Gates

Segmental Retaining Walls

Topsoil

Misc. Materials

Misc. Appurtenances

Plans can be viewed in the following locations: Buchanan and Sons Inc’s office (by appointment) – Whittier, NC

Buchanan and Sons Inc’s on-line plan room (https://bsi-construction.sharefile.com/dscb1022897634405184127a75d5fdd8ee)

DBE/MBE/WBE/HUB SUBCONTRACTORS AND SUPPLIERS ARE STRONGLY ENCOURAGED TO PARTICIPATE.

Buchanan and Sons Inc is committed to:

  • Assisting interested DBE/MBE/WBE/HUB in obtaining bonding, lines of credit, and insurance.
  • Providing interested DBE/MBE/WBE/HUB technical assistance or information related to the plans, specifications, and requirement for work to be subcontracted or supplied by these DBE/MBE/WBE/HUB.
  • Assisting interested DBE/MBE/WBE/HUB in obtaining necessary equipment, supplies, materials, or related assistance or services.
  • Sub-dividing items into economical and feasible work units to allow DBE/MBE/WBE/HUB every advantage to quoting the project.
  • Providing quick pay agreements and policies to enable DBE/MBE/WBE/HUB to meet cash flow demands.

ALL QUOTATIONS WILL NOW BE OPENLY ACCEPTED UNTIL 12:00PM MONDAY, MARCH 4TH, 2024. PROJECT BIDS TUESDAY, MARCH 5TH, 2024 AT 3:00PM. QUOTATIONS CAN BE EMAILED TO [email protected], MAILED TO PO BOX 123, WHITTIER, NC 28789 OR FAXED TO 828-497-9721.

All questions or comments for this project can be directed to: Mr. Tom Edge (Estimator) or Mrs. Jessica Lewis (Office Administrator) by phone at (828) 497-9720, fax at (828) 497-9721, or by email at [email protected]

Advertisement – WCU Joyner Drive Infrastructure Early Package

Details

Date:
March 5
Event Category: