WK Dickson/ Sevierville, TN – Murphy Road Sewer Improvements REBID
Sevierville, TN - Murphy Road Sewer Improvements REBID (20180215.00.KV) The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required to construct complete, in place, and ready to operate the following: 1. Replace approximately 1,500 LF of existing sewers with 8-inch PVC…
WK Dickson/ REBID – Maxton, NC – New Above Ground Self Serve Fuel Farm Installation
REBID - Maxton, NC - New Above Ground Self Serve Fuel Farm Installation (20210773.00 CL) The project will include installation of a one new 12,000-gallon AVGAS (AST), one new 20,000-gallon Jet-A (AST), and one new 500-gallon Diesel (AST). The AVGAS and Jet-A tanks will be self-serve with a card reader. All three new tanks will…
Pipeline Utilities/ 2023 2 Inch Waterline – Burlington, NC
Pipeline Utilities, Inc. (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the 2023 2 Inch Waterline project for the City of Burlington which bids June 13, 2023, at 2:00 PM. Plans and specifications for this project are available at the following locations: Pipeline Utilities, Inc.; 2204-F…
D.A. Everett Construction Group/ Mangum Elementary Renovations – Bahama, NC
D.A. Everett Construction Group has been selected as the Construction Manager @ Risk by Durham County Public Schools and is seeking to pre-qualify construction trade and specialty contractors to submit bids for furnishing labor, materials, and equipment for the Mangum Elementary Renovations project in Bahama, NC. Please note: Only subcontractors who have been prequalified by…
Insituform/City of Kinston Briery Run
Insituform Technologies, LLC 1076-A Van Buren Ave. Indian Trail, NC 28079 May 16, 2023 Kinston, NC Briery Run Sewer Rehabilitation Phase V Bid # CS370527-14 Bid date, June 13, 2022 The City of Kinston is bidding this project on Monday, June 13, 2022, at 2:00 pm. The scope is mainly 3,100 LF…
ST Wooten/ Grading, Drainage, Paving and Structures work to replace Bridge 29 in Pitt County, NC
DB00555 Pitt over Fork Swamp Grading, Drainage, Paving and Structures work to replace Bridge 29 in Pitt County, NC. Jack Jones Road - Winterville, NC 28590- Bids are due by June 14, 2023 02:00 PM The following work codes are applicable to this project: 000050 - Hauling (Gravel, Sand, Debris, Etc) 000055 - Hauling (Asphalt)…
Pipeline Utilities/ Cardinal Lane Sewer Outfall Relocation – Village of Alamance
Pipeline Utilities, Inc. (NC General Contractor License No. 325) is seeking certified DBE, MBE, and WBE subcontractors and suppliers for the Cardinal Lane Sewer Outfall Relocation project for the Village of Alamance which bids June 14, 2023, at 2:00 PM. Plans and specifications for this project are available at the following locations: Pipeline Utilities, Inc.;…
T.A. Loving/ Replace Bridge #29 Over Fork Swamp in Pitt County (Division 2)
T. A. Loving Company (NC General Contractor License No. 325) is seeking certified DBE subcontractors and suppliers for the following projects that bid for NCDOT: Bid Date: 06/14/2023 at 2:00 PM Project: Replace Bridge #29 Over Fork Swamp in Pitt County (Division 2) Plans and specifications are available for inspection at the following…
City of Raleigh/Custodial Services Correction
Having trouble viewing this email? View it as a Web page. Department of Equity and Inclusion Minority & Women-Owned Business Enterprise (MWBE) Program RFP: Custody Services The City of Raleigh (COR) is solicitating proposals from one or more firm(s) with which to contract for the following services: Custody Services Important Dates: Deadline for written questions is…
Delta Airport Consultants/ Gallipolis, OH – Construct Terminal Building: Schedule 3-Building Construction
Gallipolis, OH - Construct Terminal Building: Schedule 3-Building Construction (23048) This project is for the replacement of the existing General Aviation Airport Terminal Building. The new building will be constructed on the same location as the existing General Aviation Airport Terminal Building. The existing Terminal Building was built in the 1960’s and is well beyond…
Cumming Construction Management/ North Charleston, SC – Pepperhill ES Door and Hardware Replacement
North Charleston, SC - Pepperhill ES Door and Hardware Replacement Scope of work is, but not limited to: Replacement of Doors and Hardware as outlined in the project documents. Separate exterior and interior if budget/phasing concerned. The Owner has retained the services of a Program Manager to represent the Owner's interest during construction. For information…
City of Raleigh/Janitorial
RFP: Janitorial Service Water Treatment Divisions The City of Raleigh (COR) is solicitating proposals from one or more firm(s) with which to contract for the following services: Janitorial services, the scope of service shall encompass providing janitorial services at three (3) facilities as listed in Section 1.4 of this RFP at intervals as defined herein.…